<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>EHSLibrary &#187; 2nd floor remodel</title>
	<atom:link href="http://library.med.utah.edu/blog/eccles/tag/2nd-floor-remodel/feed/" rel="self" type="application/rss+xml" />
	<link>http://library.med.utah.edu/blog/eccles</link>
	<description>Spencer S. Eccles Health Sciences Library Blog</description>
	<lastBuildDate>Wed, 22 May 2013 16:00:17 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.5.1</generator>
		<item>
		<title>Spring 2012 Remodeling: construction complete, nearly ready for move-in</title>
		<link>http://library.med.utah.edu/blog/eccles/2012/06/07/spring-2012-remodeling-construction-complete-nearly-ready-for-move-in/</link>
		<comments>http://library.med.utah.edu/blog/eccles/2012/06/07/spring-2012-remodeling-construction-complete-nearly-ready-for-move-in/#comments</comments>
		<pubDate>Thu, 07 Jun 2012 14:00:23 +0000</pubDate>
		<dc:creator>Todd Vandenbark</dc:creator>
				<category><![CDATA[ceiling project]]></category>
		<category><![CDATA[construction]]></category>
		<category><![CDATA[2nd floor remodel]]></category>
		<category><![CDATA[spring remodel]]></category>

		<guid isPermaLink="false">http://library.med.utah.edu/blog/eccles/?p=2099</guid>
		<description><![CDATA[The plastic sheeting no longer hangs from the ceiling, and visitors can see clearly into the new offices on the second floor. Once HVAC adjustments and the final inspection are completed, library faculty can finally move into new offices! While we have referred to this as a recent remodeling project, it actually began in the [...]]]></description>
				<content:encoded><![CDATA[<p>The plastic sheeting no longer hangs from the ceiling, and visitors can see clearly into the new offices on the second floor. Once HVAC adjustments and the final inspection are completed, library faculty can finally move into new offices!<br />
<object classid="clsid:d27cdb6e-ae6d-11cf-96b8-444553540000" codebase="http://download.macromedia.com/pub/shockwave/cabs/flash/swflash.cab#version=6,0,40,0"><param name="flashvars" value="offsite=true&amp;lang=en-us&amp;page_show_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157630068680376%2Fshow%2F&amp;page_show_back_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157630068680376%2F&amp;set_id=72157630068680376&amp;jump_to=" /><param name="allowFullScreen" value="true" /><param name="src" value="http://www.flickr.com/apps/slideshow/show.swf?v=109615" /><param name="allowfullscreen" value="true" /><embed type="application/x-shockwave-flash" src="http://www.flickr.com/apps/slideshow/show.swf?v=109615" flashvars="offsite=true&amp;lang=en-us&amp;page_show_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157630068680376%2Fshow%2F&amp;page_show_back_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157630068680376%2F&amp;set_id=72157630068680376&amp;jump_to=" allowFullScreen="true" allowfullscreen="true" /></object></p>
<p>While we have referred to this as a recent remodeling project, it actually began in the fall of 2010 as the &#8220;Ceiling Project,&#8221; when the library had to close off sections for asbestos abatement, and updates to electrical systems and network wiring.<br />
<object classid="clsid:d27cdb6e-ae6d-11cf-96b8-444553540000" codebase="http://download.macromedia.com/pub/shockwave/cabs/flash/swflash.cab#version=6,0,40,0"><param name="flashvars" value="offsite=true&amp;lang=en-us&amp;page_show_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157623001841180%2Fshow%2F&amp;page_show_back_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157623001841180%2F&amp;set_id=72157623001841180&amp;jump_to=" /><param name="allowFullScreen" value="true" /><param name="src" value="http://www.flickr.com/apps/slideshow/show.swf?v=109615" /><param name="allowfullscreen" value="true" /><embed type="application/x-shockwave-flash" src="http://www.flickr.com/apps/slideshow/show.swf?v=109615" flashvars="offsite=true&amp;lang=en-us&amp;page_show_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157623001841180%2Fshow%2F&amp;page_show_back_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157623001841180%2F&amp;set_id=72157623001841180&amp;jump_to=" allowFullScreen="true" allowfullscreen="true" /></object></p>
<p>We want to thank all of our patrons for their patience and understanding during these crazy months.</p>
]]></content:encoded>
			<wfw:commentRss>http://library.med.utah.edu/blog/eccles/2012/06/07/spring-2012-remodeling-construction-complete-nearly-ready-for-move-in/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Remodeling project: furniture in place</title>
		<link>http://library.med.utah.edu/blog/eccles/2012/05/23/remodeling-project-furniture-in-place/</link>
		<comments>http://library.med.utah.edu/blog/eccles/2012/05/23/remodeling-project-furniture-in-place/#comments</comments>
		<pubDate>Wed, 23 May 2012 14:14:25 +0000</pubDate>
		<dc:creator>Todd Vandenbark</dc:creator>
				<category><![CDATA[construction]]></category>
		<category><![CDATA[general interest]]></category>
		<category><![CDATA[2nd floor remodel]]></category>
		<category><![CDATA[office furniture]]></category>
		<category><![CDATA[spring remodel]]></category>

		<guid isPermaLink="false">http://library.med.utah.edu/blog/eccles/?p=1993</guid>
		<description><![CDATA[Office furniture is now in place, and the spring remodeling project is moving steadily towards completion.]]></description>
				<content:encoded><![CDATA[<p>Furniture for the new offices on the upper and lower levels has been assembled and installed. Finishing touches on the ceilings and walls, hooking up telephone lines and Ethernet connections and a few last-minute items are all that is left before people can start moving in.<br />
<object classid="clsid:d27cdb6e-ae6d-11cf-96b8-444553540000" codebase="http://download.macromedia.com/pub/shockwave/cabs/flash/swflash.cab#version=6,0,40,0"><param name="flashvars" value="offsite=true&amp;lang=en-us&amp;page_show_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629832585320%2Fshow%2F&amp;page_show_back_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629832585320%2F&amp;set_id=72157629832585320&amp;jump_to=" /><param name="allowFullScreen" value="true" /><param name="src" value="http://www.flickr.com/apps/slideshow/show.swf?v=109615" /><param name="allowfullscreen" value="true" /><embed type="application/x-shockwave-flash" src="http://www.flickr.com/apps/slideshow/show.swf?v=109615" flashvars="offsite=true&amp;lang=en-us&amp;page_show_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629832585320%2Fshow%2F&amp;page_show_back_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629832585320%2F&amp;set_id=72157629832585320&amp;jump_to=" allowFullScreen="true" allowfullscreen="true" /></object></p>
]]></content:encoded>
			<wfw:commentRss>http://library.med.utah.edu/blog/eccles/2012/05/23/remodeling-project-furniture-in-place/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Remodeling progress</title>
		<link>http://library.med.utah.edu/blog/eccles/2012/04/06/remodeling-progress/</link>
		<comments>http://library.med.utah.edu/blog/eccles/2012/04/06/remodeling-progress/#comments</comments>
		<pubDate>Fri, 06 Apr 2012 15:45:01 +0000</pubDate>
		<dc:creator>Todd Vandenbark</dc:creator>
				<category><![CDATA[construction]]></category>
		<category><![CDATA[2nd floor remodel]]></category>

		<guid isPermaLink="false">http://library.med.utah.edu/blog/eccles/?p=1832</guid>
		<description><![CDATA[As we move through the spring semester, you can see construction &#38; remodeling progress on the upper and lower levels in this slideshow, from beginning through now (early April).]]></description>
				<content:encoded><![CDATA[<p>As we move through the spring semester, you can see construction &amp; remodeling progress on the upper and lower levels in this slideshow, from beginning through now (early April).</p>
<p><object height="300"><param name="flashvars" value="offsite=true&#038;lang=en-us&#038;page_show_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629131007677%2Fshow%2F&#038;page_show_back_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629131007677%2F&#038;set_id=72157629131007677&#038;jump_to="></param><param name="movie" value="http://www.flickr.com/apps/slideshow/show.swf?v=109615"></param><param name="allowFullScreen" value="true"></param><embed type="application/x-shockwave-flash" src="http://www.flickr.com/apps/slideshow/show.swf?v=109615" allowFullScreen="true" flashvars="offsite=true&#038;lang=en-us&#038;page_show_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629131007677%2Fshow%2F&#038;page_show_back_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629131007677%2F&#038;set_id=72157629131007677&#038;jump_to=" height="300"></embed></object></p>
]]></content:encoded>
			<wfw:commentRss>http://library.med.utah.edu/blog/eccles/2012/04/06/remodeling-progress/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Spring remodel progresses: walls, ventilation and sheetrock</title>
		<link>http://library.med.utah.edu/blog/eccles/2012/03/05/spring-remodel-progresses-walls-ventilation-and-sheetrock/</link>
		<comments>http://library.med.utah.edu/blog/eccles/2012/03/05/spring-remodel-progresses-walls-ventilation-and-sheetrock/#comments</comments>
		<pubDate>Mon, 05 Mar 2012 15:29:28 +0000</pubDate>
		<dc:creator>Todd Vandenbark</dc:creator>
				<category><![CDATA[construction]]></category>
		<category><![CDATA[2nd floor remodel]]></category>
		<category><![CDATA[photos]]></category>
		<category><![CDATA[sheetrock]]></category>

		<guid isPermaLink="false">http://library.med.utah.edu/blog/eccles/?p=1708</guid>
		<description><![CDATA[Remodeling at the Eccles Library continues, as walls with sheetrock, and new ventilation are installed. For information on expected noise levels, please check the home page on the library&#8217;s website. The spots you are seeing on the photographs are not the result of a dirty lens. It&#8217;s the dust from all the sanding going on!]]></description>
				<content:encoded><![CDATA[<p>Remodeling at the Eccles Library continues, as walls with sheetrock, and new ventilation are installed. For information on expected noise levels, please check the <a title="Eccles Library website" href="http://library.med.utah.edu/">home page</a> on the library&#8217;s website.</p>
<p>The spots you are seeing on the photographs are not the result of a dirty lens. It&#8217;s the dust from all the sanding going on!<br />
<object classid="clsid:d27cdb6e-ae6d-11cf-96b8-444553540000" codebase="http://download.macromedia.com/pub/shockwave/cabs/flash/swflash.cab#version=6,0,40,0"><param name="flashvars" value="offsite=true&amp;lang=en-us&amp;page_show_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629153928680%2Fshow%2F&amp;page_show_back_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629153928680%2F&amp;set_id=72157629153928680&amp;jump_to=" /><param name="allowFullScreen" value="true" /><param name="src" value="http://www.flickr.com/apps/slideshow/show.swf?v=109615" /><param name="allowfullscreen" value="true" /><embed type="application/x-shockwave-flash" src="http://www.flickr.com/apps/slideshow/show.swf?v=109615" flashvars="offsite=true&amp;lang=en-us&amp;page_show_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629153928680%2Fshow%2F&amp;page_show_back_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629153928680%2F&amp;set_id=72157629153928680&amp;jump_to=" allowFullScreen="true" allowfullscreen="true" /></object></p>
]]></content:encoded>
			<wfw:commentRss>http://library.med.utah.edu/blog/eccles/2012/03/05/spring-remodel-progresses-walls-ventilation-and-sheetrock/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Photos of our spring remodeling</title>
		<link>http://library.med.utah.edu/blog/eccles/2012/03/01/photos-of-our-spring-remodeling/</link>
		<comments>http://library.med.utah.edu/blog/eccles/2012/03/01/photos-of-our-spring-remodeling/#comments</comments>
		<pubDate>Thu, 01 Mar 2012 15:10:19 +0000</pubDate>
		<dc:creator>Todd Vandenbark</dc:creator>
				<category><![CDATA[construction]]></category>
		<category><![CDATA[2nd floor remodel]]></category>
		<category><![CDATA[slide show]]></category>

		<guid isPermaLink="false">http://library.med.utah.edu/blog/eccles/?p=1698</guid>
		<description><![CDATA[Slideshow of progress on remodeling the library]]></description>
				<content:encoded><![CDATA[<p>The Library&#8217;s lower and upper levels are being remodeled over the coming months. At times the work will be noisy, so we are posting &#8220;noise forecasts&#8221; on our <a title="Library website" href="http://library.med.utah.edu/">website&#8217;s home page</a> so patrons can know what to expect. Students and others needed quiet are encouraged to use study spaces in HSEB. Thank you for your patience as we work to improve the space we serve patrons in!<br />
<object height="300"><param name="flashvars" value="offsite=true&#038;lang=en-us&#038;page_show_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629124229204%2Fshow%2F&#038;page_show_back_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629124229204%2F&#038;set_id=72157629124229204&#038;jump_to="></param><param name="movie" value="http://www.flickr.com/apps/slideshow/show.swf?v=109615"></param><param name="allowFullScreen" value="true"></param><embed type="application/x-shockwave-flash" src="http://www.flickr.com/apps/slideshow/show.swf?v=109615" allowFullScreen="true" flashvars="offsite=true&#038;lang=en-us&#038;page_show_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629124229204%2Fshow%2F&#038;page_show_back_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629124229204%2F&#038;set_id=72157629124229204&#038;jump_to=" height="300"></embed></object></p>
]]></content:encoded>
			<wfw:commentRss>http://library.med.utah.edu/blog/eccles/2012/03/01/photos-of-our-spring-remodeling/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Construction notice for Eccles Library</title>
		<link>http://library.med.utah.edu/blog/eccles/2012/01/26/construction-notice-for-eccles-library-2/</link>
		<comments>http://library.med.utah.edu/blog/eccles/2012/01/26/construction-notice-for-eccles-library-2/#comments</comments>
		<pubDate>Thu, 26 Jan 2012 23:14:37 +0000</pubDate>
		<dc:creator>Todd Vandenbark</dc:creator>
				<category><![CDATA[construction]]></category>
		<category><![CDATA[2nd floor remodel]]></category>
		<category><![CDATA[remodel]]></category>

		<guid isPermaLink="false">http://library.med.utah.edu/blog/eccles/?p=1415</guid>
		<description><![CDATA[Construction notice about remodeling project for the 2nd floor of the library.]]></description>
				<content:encoded><![CDATA[<p><img class="alignleft" style="border: 0pt none;float: left" src="http://library.med.utah.edu/lib_layouts/pics/uutempl/hardhat_32px.png" alt="" />Remodeling of the second floor of Eccles Library will begin on Monday, January 30th, 2012, at 7:30 a.m., and should last for approximately 2-3 months. Patrons are encouraged to use the <a href="http://library.med.utah.edu/blog/eccles/2011/10/10/new-study-spaces-at-eccles-library/">new study pods</a> on the 1st floor, as well as spaces in the HSEB next door. We apologize for any inconvenience this may cause. Watch this blog for ongoing updates, and thanks for your patience!</p>
]]></content:encoded>
			<wfw:commentRss>http://library.med.utah.edu/blog/eccles/2012/01/26/construction-notice-for-eccles-library-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
