{"id":14080,"date":"2023-02-28T05:00:00","date_gmt":"2023-02-28T12:00:00","guid":{"rendered":"https:\/\/library.med.utah.edu\/blog\/eccles\/?page_id=14080"},"modified":"2026-02-03T09:39:51","modified_gmt":"2026-02-03T16:39:51","slug":"transformation","status":"publish","type":"page","link":"https:\/\/library.med.utah.edu\/blog\/eccles\/transformation\/","title":{"rendered":"Transformation"},"content":{"rendered":"\n<p class=\"has-text-align-center entry-warning has-white-color has-text-color has-background has-medium-font-size\" style=\"background-color:#444444;font-style:normal;font-weight:300;letter-spacing:1px\">FOR URGENT BUILDING REQUESTS CONTACT <a href=\"tel:1-801-581-7221\">801-581-7221 (24hr)<\/a><\/p>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image size-full\" id=\"updates\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-construction-updates.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"120\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-construction-updates.jpg\" alt=\"Updates\" class=\"wp-image-14120\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-construction-updates.jpg 700w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-construction-updates-300x51.jpg 300w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/a><\/figure>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">UPCOMING:<\/h2>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">February 2, 2025<\/mark><\/strong> | <strong>Badge Access for EHSEB<\/strong><\/p>\n\n\n\n<p>Beginning Monday, February 2, Eccles Health Sciences Education Building will shift to badge-only access on all exterior doors, except for the first-floor northwest entrance near the bookstore, which will remain open. This is being done as a security best practice, while continuing to support the day-to-day activities in EHSEB.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">December 11, 2025<\/mark><\/strong> | <strong>Construction update<\/strong><\/p>\n\n\n\n<p>North Bridge &amp; Wintrobe Service Road\/Pedestrian Pathway will be closed through the second week of January. The path from the Hospital to EHSEB will be changing, we will be routed around the Human Genetics building.&nbsp;<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">December 8, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/12\/construction_closing.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/12\/construction_closing-1024x576.jpg\" alt=\"\" class=\"wp-image-17158\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/12\/construction_closing-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/12\/construction_closing-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/12\/construction_closing-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/12\/construction_closing-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/12\/construction_closing.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Starting Monday December 8th, parts of the library will be closed for 6 weeks due to construction. The lower level bathrooms and study rooms 7, 8 and 9 will be inaccessible. Emergency exits are on the main level on the south and west faces of the building. North Door will be CLOSED!<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">November 24, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_112425.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_112425-1024x576.jpg\" alt=\"\" class=\"wp-image-17147\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_112425-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_112425-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_112425-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_112425-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_112425.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of November 24, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>24<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>25<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>26<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>27<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>28<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Storage Room Ceiling Grid<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3 out of 10<\/td><\/tr><tr><td>UIT Comm Room Moves<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">November 17, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_111725.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_111725-1024x576.jpg\" alt=\"\" class=\"wp-image-17138\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_111725-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_111725-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_111725-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_111725-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_111725.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of November 17, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>17<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>18<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>19<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>20<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>21<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Touch Ups, Base, Paint<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3 out of 10<\/td><\/tr><tr><td>UIT Comm Room Moves<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>Acoustical Ceiling Tiles<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">November 10, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_111025.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_111025-1024x576.jpg\" alt=\"\" class=\"wp-image-17118\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_111025-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_111025-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_111025-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_111025-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/11\/ehsl-construction-disturbance-level-1920x1080_111025.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of November 10, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>10<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>11<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>12<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>13<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>14<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Electrical Work<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">3 out of 10<\/td><\/tr><tr><td>UIT Comm Room Moves<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3 out of 10<\/td><\/tr><tr><td>Acoustical Ceiling Tiles<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>Bench Install<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">November 3, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-110325.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-110325-1024x576.jpg\" alt=\"\" class=\"wp-image-17086\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-110325-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-110325-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-110325-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-110325-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-110325.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of November 3, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>3<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>4<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>5<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>6<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>7<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Alertus Beacons<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">2 out of 10<\/td><\/tr><tr><td>Painting<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3 out of 10<\/td><\/tr><tr><td>Display Glass Doors<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>Finish Electrical<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>UIT Comm Room Moves<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">October 27, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080_102725.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080_102725-1024x576.jpg\" alt=\"\" class=\"wp-image-17081\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080_102725-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080_102725-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080_102725-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080_102725-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080_102725.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of October 27, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>27<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>28<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>29<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>30<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>31<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Drywall &amp; Paint Touch Ups<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>UIT Move Comm Rooms<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>Shelves, Benches, Base<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>Finish Lights<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">October 20, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-102025.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-102025-1024x576.jpg\" alt=\"\" class=\"wp-image-17077\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-102025-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-102025-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-102025-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-102025-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-102025.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of October 20, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>20<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>21<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>22<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>23<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>24<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Shelves, Lactation Room Top, Benches, Base<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1 out of 10<\/td><\/tr><tr><td>Drywall &amp; Paint Touch Ups<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4 out of 10<\/td><\/tr><tr><td>Storefront-Glass Install<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>Lighting Install<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">October 13, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080_v2_20251009.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080_v2_20251009-1024x576.jpg\" alt=\"Eccles Library construction noise level, between 1-7 on a scale 1-10\" class=\"wp-image-17071\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080_v2_20251009-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080_v2_20251009-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080_v2_20251009-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080_v2_20251009-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080_v2_20251009.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of October 13, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>13<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>14<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>15<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>16<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>17<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>UIT Move Comm Rooms <\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><tr><td>Carpet<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\"> 7out of 10<\/td><\/tr><tr><td>Shelves, Lactation Room Top, Benches, Base<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1 out of 10<\/td><\/tr><tr><td><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">October 6, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-100625.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-100625-1024x576.jpg\" alt=\"\" class=\"wp-image-17051\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-100625-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-100625-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-100625-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-100625-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/10\/ehsl-construction-disturbance-level-1920x1080-100625.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of October 6, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>6<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>7<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>8<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>9<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>10<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Shelves, Lactation Room Top, Benches, Base<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>Install Doors<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><tr><td>Carpet<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><tr><td>UIT Move Comm Rooms<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_092925.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_092925-1024x576.jpg\" alt=\"\" class=\"wp-image-17046\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_092925-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_092925-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_092925-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_092925-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_092925.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">September 29, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of September 29, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>29<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>30<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>1<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>2<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>3<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>MEP Finishes<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>UIT Move Comm Rooms<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><tr><td>Shelves, Lactation Room Cabinet, Benches, Base<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><tr><td>Existing Wood Base<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">September 22, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_092225.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_092225-1024x576.jpg\" alt=\"\" class=\"wp-image-17042\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_092225-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_092225-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_092225-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_092225-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_092225.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of September 22, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>22<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>23<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>24<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>25<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>26<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>MEP Finishes<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>UIT Move Comm Rooms<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><tr><td>Shelves, Lactation Room Cabinet &amp; Base<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">September 15, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_091525.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_091525-1024x576.jpg\" alt=\"\" class=\"wp-image-17038\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_091525-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_091525-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_091525-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_091525-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_091525.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of September 15, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>15<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>16<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>17<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>18<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>19<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Acoustic Ceiling Grid<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">3 out of 10<\/td><\/tr><tr><td>UIT Move Comm Rooms<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>Install Shelves<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><tr><td>Storefront Doors<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><tr><td>Lower Level Door Demo<\/td><td class=\"has-text-align-center\" data-align=\"center\">9<\/td><td class=\"has-text-align-center\" data-align=\"center\">9<\/td><td class=\"has-text-align-center\" data-align=\"center\">9<\/td><td class=\"has-text-align-center\" data-align=\"center\">9<\/td><td class=\"has-text-align-center\" data-align=\"center\">9<\/td><td class=\"has-text-align-center\" data-align=\"center\">9 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">September 8, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_090825.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_090825-1024x576.jpg\" alt=\"\" class=\"wp-image-17034\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_090825-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_090825-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_090825-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_090825-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_090825.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of September 8, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>8<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>9<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>10<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>11<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>12<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Paint Connection\/Book Vault<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>MEP Finish<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>UIT Mobilization to Move Comm Rooms<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>Wood Walls &amp; Felt <\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">September 1, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_090125.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_090125-1024x576.jpg\" alt=\"\" class=\"wp-image-17027\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_090125-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_090125-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_090125-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_090125-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/09\/ehsl-construction-disturbance-level-1920x1080_090125.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of September 1, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>1<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>2<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>3<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>4<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>5<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Paint Connection<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4 out of 10<\/td><\/tr><tr><td>MEP Finish Comm Rooms<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>Wood Walls &amp; Felt <\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">August 25, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_082525.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_082525-1024x576.jpg\" alt=\"\" class=\"wp-image-17021\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_082525-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_082525-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_082525-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_082525-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_082525.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of August 25, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>25<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>26<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>27<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>28<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>29<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Paint Comm Rooms<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">3 out of 10<\/td><\/tr><tr><td>Finish Comm Rooms<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><tr><td>Wood Walls &amp; Felt Install<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">August 18, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_081825.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_081825-1024x576.jpg\" alt=\"\" class=\"wp-image-17002\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_081825-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_081825-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_081825-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_081825-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_081825.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of August 18, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>18<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>19<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>20<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>21<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>22<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Paint Comm Rooms<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4 out of 10<\/td><\/tr><tr><td>Finish Comm Rooms<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><tr><td>Drywall Connection<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><tr><td>Wood Walls<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">August 11, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_081125.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_081125-1024x576.jpg\" alt=\"\" class=\"wp-image-16998\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_081125-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_081125-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_081125-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_081125-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_081125.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of August 11, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>11<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>12<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>13<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>14<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>15<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Paint Rooms Lower Level<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">1 out of 10<\/td><\/tr><tr><td>Wood Walls Main Floor<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><tr><td>Finish Comm Rooms<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><tr><td>Floor Boxes Reading Room<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><tr><td>Wood Walls Lower Level<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">August 4, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_080425.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_080425-1024x576.jpg\" alt=\"\" class=\"wp-image-16973\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_080425-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_080425-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_080425-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_080425-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/08\/ehsl-construction-disturbance-level-1920x1080_080425.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of August 4, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>4<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>5<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>6<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>7<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>8<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Insulation <\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">4 out of 10<\/td><\/tr><tr><td>Wood Wall Installation<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><tr><td>Drywall<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">July 28, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_072825.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_072825-1024x576.jpg\" alt=\"\" class=\"wp-image-16935\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_072825-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_072825-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_072825-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_072825-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_072825.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of July 28, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>28<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>29<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>30<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>31<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>1<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Drywall &amp; Insulation (Comm &amp; Lactation Rooms)<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4 out of 10<\/td><\/tr><tr><td>Wood Wall Install Main Level<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><tr><td>Concrete Pours<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><tr><td>Rough MEP Connection Area<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><tr><td>Framing SOM Connection Area<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">8 out of 10<\/td><\/tr><tr><td>Lower Level Demo Glass Between Existing Offices<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">July 21, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_072125.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_072125-1024x576.jpg\" alt=\"\" class=\"wp-image-16868\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_072125-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_072125-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_072125-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_072125-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_072125.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of July 21, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>21<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>22<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>23<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>24<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>25<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Wood Walls<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><tr><td>Concrete Pours<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><tr><td>Rough MEP<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><tr><td>Drywall Install<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">July 14, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_071425.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_071425-1024x576.jpg\" alt=\"\" class=\"wp-image-16859\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_071425-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_071425-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_071425-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_071425-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/07\/ehsl-construction-disturbance-level-1920x1080_071425.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of July 14, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>14<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>15<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>16<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>17<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>18<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Door Install<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4 out of 10<\/td><\/tr><tr><td>Concrete Pours<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><tr><td>Wood Wall Install<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><tr><td>Rough MEP<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td class=\"has-text-align-center\" data-align=\"center\">6 out of 10<\/td><\/tr><tr><td>Framing<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">July 7, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_v2_20250707.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_v2_20250707-1024x576.jpg\" alt=\"Eccles Library Construction Update for July 7 - July 11\" class=\"wp-image-16855\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_v2_20250707-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_v2_20250707-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_v2_20250707-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_v2_20250707-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_v2_20250707.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of July 7, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon <br>7<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue <br>8<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed <br>9<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu <br>10<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri <br>11<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Framing<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8 out of 10<\/td><\/tr><tr><td>Rough MEP Comm rooms<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4 out of 10<\/td><\/tr><tr><td><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><\/tr><tr><td><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">June 30, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_v2_20250630.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_v2_20250630-1024x576.jpg\" alt=\"\" class=\"wp-image-16851\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_v2_20250630-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_v2_20250630-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_v2_20250630-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_v2_20250630-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_v2_20250630.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of June 30, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon <br>30<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue <br>1<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed<br>2<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu<br>3<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri<br>4<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Flooring Concrete<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">4 out of 10<\/td><\/tr><tr><td>Framing<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">8 out of 10<\/td><\/tr><tr><td>Rough MEP Comm rooms<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">4 out of 10<\/td><\/tr><tr><td><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">June 23, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_062325.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_062325-1024x576.jpg\" alt=\"\" class=\"wp-image-16846\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_062325-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_062325-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_062325-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_062325-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_062325.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of June 23, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>23<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>24<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed<br>25<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu<br>26<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri<br>27<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Electrical Demo<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1 out of 10<\/td><\/tr><tr><td>Bathroom Finishes<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3 out of 10<\/td><\/tr><tr><td>Concrete Pour<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><tr><td>Framing Phase 2<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">June 16, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_061625.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_061625-1024x576.jpg\" alt=\"\" class=\"wp-image-16798\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_061625-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_061625-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_061625-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_061625-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_061625.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of June 16, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>16<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>17<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed<br>18<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu<br>19<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri<br>20<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Floor Concrete<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">5 out of 10<\/td><\/tr><tr><td>Framing<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><tr><td>Concrete Pours<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">June 9, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><mark style=\"background-color:#00d084\" class=\"has-inline-color has-black-color\">Spencer S. Eccles Health Sciences Library Reopens June 8th, 7am.  All services operational. Front desk staff returns to Library\u2019s main floor location. In-person: Monday &#8211; Friday, 7am-6pm <\/mark><\/h2>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">June 9, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_060625.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_060625-1024x576.jpg\" alt=\"\" class=\"wp-image-16791\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_060625-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_060625-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_060625-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_060625-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/06\/ehsl-construction-disturbance-level-1920x1080_060625.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of June 9, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>9<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>10<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed<br>11<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu<br>12<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri<br>13<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Punchlist Items<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4 out of 10<\/td><\/tr><tr><td>Plumbing<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><tr><td>Steel Install<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td class=\"has-text-align-center\" data-align=\"center\">8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">May 19 to June 8, 2025<\/mark><\/strong> | <strong>Construction update<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><mark style=\"background-color:#fcb900\" class=\"has-inline-color has-black-color\">The Spencer S. Eccles Health Sciences Library will close for 3 weeks: May 19 \u2013 June 8 due to construction<\/mark><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The library&#8217;s front desk staff will temporarily be relocated in Eccles Health Sciences Education Building (EHSEB) 3100, Computer Suite and available M-F, 7am-6pm. <\/li>\n\n\n\n<li>If you have questions, please contact Eccles Library staff by <a href=\"https:\/\/libanswers.med.utah.edu\">clicking here<\/a>, calling <a href=\"tel:8015815534\">801-581-5534<\/a> or live chat <a href=\"https:\/\/library.med.utah.edu\/ask\/\">https:\/\/library.med.utah.edu\/ask\/<\/a><\/li>\n\n\n\n<li>FOR URGENT BUILDING REQUESTS CONTACT <a href=\"tel:1-801-581-7221\">801-581-7221 (24hr)<\/a><\/li>\n\n\n\n<li>EHSEB is open regular hours with 24\/7 badge access. Security will be present. <\/li>\n\n\n\n<li>EHSEB study rooms <a href=\"https:\/\/ehseb.utah.edu\/spaces\/study-rooms\/\">https:\/\/ehseb.utah.edu\/spaces\/study-rooms\/<\/a><\/li>\n\n\n\n<li>EHSEB computer suite <a href=\"https:\/\/ehseb.utah.edu\/spaces\/computer-suite\/\">https:\/\/ehseb.utah.edu\/spaces\/computer-suite\/<\/a><br><\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehseb-floor3-3100-computer-suite-ehsl-front-desk-location-20250519-0608_1.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"853\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehseb-floor3-3100-computer-suite-ehsl-front-desk-location-20250519-0608_1-1024x853.png\" alt=\"Eccles Library Front Desk construction relocation May 19 to June 8th\" class=\"wp-image-16760\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehseb-floor3-3100-computer-suite-ehsl-front-desk-location-20250519-0608_1-1024x853.png 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehseb-floor3-3100-computer-suite-ehsl-front-desk-location-20250519-0608_1-300x250.png 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehseb-floor3-3100-computer-suite-ehsl-front-desk-location-20250519-0608_1-768x640.png 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehseb-floor3-3100-computer-suite-ehsl-front-desk-location-20250519-0608_1.png 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Front Desk temporary construction relocation May 19th to June 8th<\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">May 19, 2025<\/mark><\/strong> | <strong>Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-20250519-23_1920x1080_v2.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-20250519-23_1920x1080_v2-1024x576.jpg\" alt=\"Eccles Library Construction Disturbance Level May 19-23, 2025\" class=\"wp-image-16765\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-20250519-23_1920x1080_v2-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-20250519-23_1920x1080_v2-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-20250519-23_1920x1080_v2-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-20250519-23_1920x1080_v2-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-20250519-23_1920x1080_v2.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Eccles Library Construction Disturbance Level May 19-23, 2025. <\/figcaption><\/figure>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">May 12, 2025<\/mark><\/strong> | <strong>Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>19<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>20<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed<br>21<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu<br>22<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri<br>23<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>Abatement Ph 2<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\">0 out of 10<\/td><\/tr><tr><td>Punchlist<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">0 out of 10<\/td><\/tr><tr><td>Plumbing<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\">0 out of 10<\/td><\/tr><tr><td><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><\/tr><tr><td><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-20250512-16_1920x1080.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-20250512-16_1920x1080-1024x576.jpg\" alt=\"EHSL Construction Disturbance level May 12-16\" class=\"wp-image-16731\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-20250512-16_1920x1080-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-20250512-16_1920x1080-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-20250512-16_1920x1080-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-20250512-16_1920x1080-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-20250512-16_1920x1080.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of May, 13, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th class=\"has-text-align-center\" data-align=\"center\">Mon<br>12<\/th><th class=\"has-text-align-center\" data-align=\"center\">Tue<br>13<\/th><th class=\"has-text-align-center\" data-align=\"center\">Wed<br>14<\/th><th class=\"has-text-align-center\" data-align=\"center\">Thu<br>15<\/th><th class=\"has-text-align-center\" data-align=\"center\">Fri<br>16<\/th><th class=\"has-text-align-center\" data-align=\"center\">Rating<\/th><\/tr><\/thead><tbody><tr><td>MEP Finishes<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">4 out of 10<\/td><\/tr><tr><td>Cleaning<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">4 out of 10<\/td><\/tr><tr><td>Wood Delivery <\/td><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\">7 out of 10<\/td><\/tr><tr><td><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><\/tr><tr><td><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. <\/em><\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">May 5, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-1920x1080-5level0505.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-1920x1080-5level0505-1024x576.jpg\" alt=\"\" class=\"wp-image-16720\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-1920x1080-5level0505-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-1920x1080-5level0505-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-1920x1080-5level0505-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-1920x1080-5level0505-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/05\/ehsl-construction-disturbance-level-1920x1080-5level0505.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of May, 5, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>5<\/th><th>Tue<br>6<\/th><th>Wed<br>7<\/th><th>Thu<br>8<\/th><th>Fri<br>9<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Hardware Install<\/td><td>2<\/td><td>2<\/td><td><\/td><td><\/td><td><\/td><td>2 out of 10<\/td><\/tr><tr><td>Acoustical Ceiling Tiles<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>Mirrors<\/td><td>4<\/td><td>4<\/td><td><\/td><td><\/td><td><\/td><td>4 out of 10<\/td><\/tr><tr><td>MEP Finishes<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Delivery Level 1 Wood Slat Walls<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td><\/td><td><\/td><td>7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances. Fumes possible on Thursday &amp; Friday<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">April 29, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0429.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0429-1024x576.jpg\" alt=\"\" class=\"wp-image-16708\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0429-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0429-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0429-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0429-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0429.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of April, 29, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>28<\/th><th>Tue<br>29<\/th><th>Wed<br>30<\/th><th>Thu<br>1<\/th><th>Fri<br>2<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Fan Room Start Up<\/td><td>2<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>2 out of 10<\/td><\/tr><tr><td>MEP Finishes<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td><\/td><td><\/td><td>5 out of 10<\/td><\/tr><tr><td>Door Installation<\/td><td><\/td><td>5<\/td><td>5<\/td><td><\/td><td><\/td><td>5 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">April 21, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0421.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0421-1024x576.jpg\" alt=\"\" class=\"wp-image-16619\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0421-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0421-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0421-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0421-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0421.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of April, 21, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>21<\/th><th>Tue<br>22<\/th><th>Wed<br>23<\/th><th>Thu<br>24<\/th><th>Fri<br>25<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Paint in Bathrooms<\/td><td>1<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>1 out of 10<\/td><\/tr><tr><td>Acoustical Ceiling Tiles<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td><\/td><td><\/td><td>3 out of 10<\/td><\/tr><tr><td>MEP Finishes<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Fire Inspection<\/td><td>5<\/td><td>5<\/td><td><\/td><td><\/td><td><\/td><td>5 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">April 14, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0414.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0414-1024x576.jpg\" alt=\"\" class=\"wp-image-16609\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0414-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0414-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0414-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0414-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0414.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of April, 14, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>14<\/th><th>Tue<br>15<\/th><th>Wed<br>16<\/th><th>Thu<br>17<\/th><th>Fri<br>18<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Paint in Bathrooms<\/td><td><\/td><td>1<\/td><td>1<\/td><td>1<\/td><td>1<\/td><td>1 out of 10<\/td><\/tr><tr><td>Doors Install<\/td><td><\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>Acoustical Ceiling Tiles<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Rebuild Fan Room<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">April 7, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0407.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0407-1024x576.jpg\" alt=\"\" class=\"wp-image-16588\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0407-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0407-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0407-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0407-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/04\/ehsl-construction-disturbance-level-1920x1080-0407.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of April, 7, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>7<\/th><th>Tue<br>8<\/th><th>Wed<br>9<\/th><th>Thu<br>10<\/th><th>Fri<br>11<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Paint in Bathrooms<\/td><td><\/td><td><\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>Carpet Install<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4 out of 10<\/td><\/tr><tr><td>Acoustical Ceiling<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Demo Fan Room<\/td><td>9<\/td><td>9<\/td><td>9<\/td><td><\/td><td><\/td><td>9 out of 10<\/td><\/tr><tr><td>Rebuild Fan Room<\/td><td><\/td><td>9<\/td><td>9<\/td><td>9<\/td><td>9<\/td><td>9 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><mark style=\"background-color:#fcb900\" class=\"has-inline-color has-black-color\">EHSL is closed April 2, 2025 due to construction fumes in the building. No employees or patrons in the building.<\/mark><\/h2>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">March 31, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-033125.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-033125-1024x576.jpg\" alt=\"\" class=\"wp-image-16559\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-033125-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-033125-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-033125-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-033125-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-033125.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of March, 31, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>31<\/th><th>Tue<br>1<\/th><th>Wed<br>2<\/th><th>Thu<br>3<\/th><th>Fri<br>4<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Abatement of Fan Room<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td><\/td><td><\/td><td>2 out of 10<\/td><\/tr><tr><td>MEP Finishes<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>Acoustical Ceiling<\/td><td>7<\/td><td>7<\/td><td><\/td><td><\/td><td><\/td><td>7 out of 10<\/td><\/tr><tr><td>HVAC Shutdown<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">March 24, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-0324.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-0324-1024x576.jpg\" alt=\"\" class=\"wp-image-16554\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-0324-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-0324-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-0324-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-0324-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-0324.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of March, 24, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>24<\/th><th>Tue<br>25<\/th><th>Wed<br>26<\/th><th>Thu<br>27<\/th><th>Fri<br>28<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>MDF Install<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Base at Elevator Entrances<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Steel Install at Stairs<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">March 17, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-5level0317.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-5level0317-1024x576.jpg\" alt=\"\" class=\"wp-image-16549\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-5level0317-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-5level0317-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-5level0317-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-5level0317-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-5level0317.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of March, 17, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>17<\/th><th>Tue<br>18<\/th><th>Wed<br>19<\/th><th>Thu<br>20<\/th><th>Fri<br>21<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Abatement of Steel<\/td><td><\/td><td>1<\/td><td>1<\/td><td>1<\/td><td>1<\/td><td>1 out of 10<\/td><\/tr><tr><td>Tile<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>MDF Install<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Base at Elevator Entrances<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Cable Tray Around Core<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">March 10, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-0310.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-0310-1024x576.jpg\" alt=\"\" class=\"wp-image-16525\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-0310-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-0310-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-0310-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-0310-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-0310.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of March, 10, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>10<\/th><th>Tue<br>11<\/th><th>Wed<br>12<\/th><th>Thu<br>13<\/th><th>Fri<br>14<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Paint in Bathrooms<\/td><td>1<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>1 out of 10<\/td><\/tr><tr><td>Toliet Partitions<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td><\/td><td><\/td><td>5 out of 10<\/td><\/tr><tr><td>Drywall Around Core<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>MDF Install<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">March 3, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-4levels-0303.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-4levels-0303-1024x576.jpg\" alt=\"\" class=\"wp-image-16473\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-4levels-0303-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-4levels-0303-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-4levels-0303-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-4levels-0303-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-4levels-0303.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of March, 3, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>3<\/th><th>Tue<br>4<\/th><th>Wed<br>5<\/th><th>Thu<br>6<\/th><th>Fri<br>7<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Plumbing Finishes<\/td><td><\/td><td><\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Finish Electrical<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Bathroom Tile<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Drywall Around Core<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">February 24, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0224.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0224-1024x576.jpg\" alt=\"\" class=\"wp-image-16424\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0224-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0224-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0224-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0224-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0224.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of February, 24, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>24<\/th><th>Tue<br>25<\/th><th>Wed<br>26<\/th><th>Thu<br>27<\/th><th>Fri<br>28<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Paint Elevator Entrances<\/td><td><\/td><td><\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2 out of 10<\/td><\/tr><tr><td>Bathroom Tile<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Shelf Brackets<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td><\/td><td>7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">February 17, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0217.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0217-1024x576.jpg\" alt=\"\" class=\"wp-image-16420\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0217-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0217-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0217-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0217-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0217.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of February, 17, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>17<\/th><th>Tue<br>18<\/th><th>Wed<br>19<\/th><th>Thu<br>20<\/th><th>Fri<br>21<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Taping &amp; Mudding Entrances<\/td><td>3<\/td><td>3<\/td><td><\/td><td><\/td><td><\/td><td>3 out of 10<\/td><\/tr><tr><td>Tile<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Demo Stairs<\/td><td>10<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">February 10, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0210.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0210-1024x576.jpg\" alt=\"\" class=\"wp-image-16390\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0210-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0210-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0210-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0210-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/02\/ehsl-construction-disturbance-level-1920x1080-0210.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of February, 10, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>10<\/th><th>Tue<br>11<\/th><th>Wed<br>12<\/th><th>Thu<br>13<\/th><th>Fri<br>14<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Mechanical Around Core<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2 out of 10<\/td><\/tr><tr><td>Tile<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Demo Stairs<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">February 3, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0203.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0203-1024x576.jpg\" alt=\"\" class=\"wp-image-16383\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0203-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0203-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0203-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0203-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0203.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of February, 3, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>3<\/th><th>Tue<br>4<\/th><th>Wed<br>5<\/th><th>Thu<br>6<\/th><th>Fri<br>7<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Mechanical Around Core<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2 out of 10<\/td><\/tr><tr><td>Demo of Lower Level Study Rooms<\/td><td><\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4 out of 10<\/td><\/tr><tr><td>Drywall\/Tile Backer Bathrooms<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Demo of Stairs<\/td><td><\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">January 27, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0127.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0127-1024x576.jpg\" alt=\"\" class=\"wp-image-16379\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0127-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0127-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0127-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0127-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0127.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of January, 27, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>27<\/th><th>Tue<br>28<\/th><th>Wed<br>29<\/th><th>Thu<br>30<\/th><th>Fri<br>31<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Firewall Caulk in Elevator<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td><\/td><td><\/td><td>4 out of 10<\/td><\/tr><tr><td>Mechanical Around Core<\/td><td>7<\/td><td>7<\/td><td><\/td><td><\/td><td><\/td><td>7 out of 10<\/td><\/tr><tr><td>Drywall\/Tile Backer Bathrooms<\/td><td><\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Drywall Elevator Fronts<\/td><td><\/td><td><\/td><td><\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">January 20, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0120.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0120-1024x576.jpg\" alt=\"\" class=\"wp-image-16376\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0120-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0120-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0120-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0120-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0120.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of January, 20, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>20<\/th><th>Tue<br>21<\/th><th>Wed<br>22<\/th><th>Thu<br>23<\/th><th>Fri<br>24<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Elevator Phone Line<\/td><td>4<\/td><td>4<\/td><td><\/td><td><\/td><td><\/td><td>4 out of 10<\/td><\/tr><tr><td>Fire Alarm<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Mechanical Elevator Entrances<\/td><td>7<\/td><td>7<\/td><td><\/td><td><\/td><td><\/td><td>7 out of 10<\/td><\/tr><tr><td>Fire Sprinklers<\/td><td><\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">January 13, 2025<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-0113.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-0113-1024x576.jpg\" alt=\"\" class=\"wp-image-16369\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-0113-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-0113-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-0113-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-0113-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2025\/01\/ehsl-construction-disturbance-level-1920x1080-0113.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of January, 13, 2025<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>13<\/th><th>Tue<br>14<\/th><th>Wed<br>15<\/th><th>Thu<br>16<\/th><th>Fri<br>17<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Bathroom Work<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Smoke Doors-Fire Alarm<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Fire Sprinklers<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">December 30, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><mark style=\"background-color:#fcb900\" class=\"has-inline-color\">Eccles Health Sciences Library closure for scheduled power outage is extended until 5PM, Dec 31, 2024.<\/mark><\/h2>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-4levels1230.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-4levels1230-1024x576.jpg\" alt=\"\" class=\"wp-image-16359\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-4levels1230-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-4levels1230-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-4levels1230-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-4levels1230-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-4levels1230.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of December, 30, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>30<\/th><th>Tue<br>31<\/th><th>Wed<br>1<\/th><th>Thu<br>2<\/th><th>Fri<br>3<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Rough Electrical Bathroom<\/td><td>8<\/td><td><\/td><td><\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Smoke Doors<\/td><td>8<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>8 out of 10<\/td><\/tr><tr><td>Elevator<\/td><td>8<\/td><td><\/td><td><\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Electrical Shutdown<\/td><td>8<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">December 23, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-5level1223.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-5level1223-1024x576.jpg\" alt=\"\" class=\"wp-image-16357\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-5level1223-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-5level1223-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-5level1223-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-5level1223-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-5level1223.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of December, 23, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>23<\/th><th>Tue<br>24<\/th><th>Wed<br>25<\/th><th>Thu<br>26<\/th><th>Fri<br>27<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Rough Electrical Bathroom<\/td><td>8<\/td><td><\/td><td><\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Rough Plumbing Bathroom<\/td><td>8<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>8 out of 10<\/td><\/tr><tr><td>Smoke Doors<\/td><td>8<\/td><td><\/td><td><\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Elevator<\/td><td>8<\/td><td><\/td><td><\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>4 Hour Electrical Shutdown<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">December 16, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-5level1216.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-5level1216-1024x576.jpg\" alt=\"\" class=\"wp-image-16345\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-5level1216-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-5level1216-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-5level1216-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-5level1216-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-5level1216.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of December, 16, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>16<\/th><th>Tue<br>17<\/th><th>Wed<br>18<\/th><th>Thu<br>19<\/th><th>Fri<br>20<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Framing<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Bathroom Construction<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Smoke Doors<\/td><td><\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Saw Cut Air Intake Wall<\/td><td>10<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>10 out of 10<\/td><\/tr><tr><td>Demo Electrical Room Walls<\/td><td>10<\/td><td>10<\/td><td><\/td><td><\/td><td><\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">December 9, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-1209.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-1209-1024x576.jpg\" alt=\"\" class=\"wp-image-16339\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-1209-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-1209-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-1209-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-1209-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/12\/ehsl-construction-disturbance-level-1920x1080-1209.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of December, 9, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>9<\/th><th>Tue<br>10<\/th><th>Wed<br>11<\/th><th>Thu<br>12<\/th><th>Fri<br>13<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Elevator Install<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Bathroom Framing<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">November 25, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-3levels-1125.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-3levels-1125-1024x576.jpg\" alt=\"\" class=\"wp-image-16244\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-3levels-1125-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-3levels-1125-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-3levels-1125-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-3levels-1125-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-3levels-1125.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of November, 25, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>25<\/th><th>Tue<br>26<\/th><th>Wed<br>27<\/th><th>Thu<br>28<\/th><th>Fri<br>29<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Elevator Install<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Flooring Install<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Bathroom Framing<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">November 18, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-4level1118.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-4level1118-1024x576.jpg\" alt=\"\" class=\"wp-image-16143\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-4level1118-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-4level1118-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-4level1118-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-4level1118-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-4level1118.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of November, 18, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>18<\/th><th>Tue<br>19<\/th><th>Wed<br>20<\/th><th>Thu<br>21<\/th><th>Fri<br>22<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Rough Plumbing<\/td><td><\/td><td><\/td><td><\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Elevator Install<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Flooring Install<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td><\/td><td><\/td><td>8 out of 10<\/td><\/tr><tr><td>Rough Carpentry<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td><\/td><td><\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">November 11, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-3levels-1111.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-3levels-1111-1024x576.jpg\" alt=\"\" class=\"wp-image-16092\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-3levels-1111-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-3levels-1111-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-3levels-1111-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-3levels-1111-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-3levels-1111.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of November, 11, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>11<\/th><th>Tue<br>12<\/th><th>Wed<br>13<\/th><th>Thu<br>14<\/th><th>Fri<br>15<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Elevator Install<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Flooring Install<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Rough Carpentry<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">November 4, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-1104.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-1104-1024x576.jpg\" alt=\"\" class=\"wp-image-16088\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-1104-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-1104-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-1104-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-1104-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/11\/ehsl-construction-disturbance-level-1920x1080-1104.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of November, 4, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>4<\/th><th>Tue<br>5<\/th><th>Wed<br>6<\/th><th>Thu<br>7<\/th><th>Fri<br>8<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Elevator Install<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Flooring Install<\/td><td><\/td><td><\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">October 28, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/ehsl-construction-disturbance-level-1920x1080-4level1028.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/ehsl-construction-disturbance-level-1920x1080-4level1028-1024x576.jpg\" alt=\"\" class=\"wp-image-16078\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/ehsl-construction-disturbance-level-1920x1080-4level1028-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/ehsl-construction-disturbance-level-1920x1080-4level1028-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/ehsl-construction-disturbance-level-1920x1080-4level1028-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/ehsl-construction-disturbance-level-1920x1080-4level1028-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/ehsl-construction-disturbance-level-1920x1080-4level1028.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of October, 28, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>28<\/th><th>Tue<br>29<\/th><th>Wed<br>30<\/th><th>Thu<br>31<\/th><th>Fri<br>1<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Rough Plumbing<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Elevator Install<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Flooring Install<\/td><td><\/td><td><\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Rough Framing<\/td><td>8<\/td><td>8<\/td><td><\/td><td><\/td><td><\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">October 21, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/som-construction-disturbance-3level-1920x1080-2levels-1021.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/som-construction-disturbance-3level-1920x1080-2levels-1021-1024x576.jpg\" alt=\"\" class=\"wp-image-16060\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/som-construction-disturbance-3level-1920x1080-2levels-1021-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/som-construction-disturbance-3level-1920x1080-2levels-1021-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/som-construction-disturbance-3level-1920x1080-2levels-1021-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/som-construction-disturbance-3level-1920x1080-2levels-1021-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/som-construction-disturbance-3level-1920x1080-2levels-1021.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of October, 21, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>21<\/th><th>Tue<br>22<\/th><th>Wed<br>23<\/th><th>Thu<br>24<\/th><th>Fri<br>25<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Rough Plumbing<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Elevator Install<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">October 14, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/som-construction-disturbance-3level-1920x1080-1014.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/som-construction-disturbance-3level-1920x1080-1014-1024x576.jpg\" alt=\"\" class=\"wp-image-16042\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/som-construction-disturbance-3level-1920x1080-1014-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/som-construction-disturbance-3level-1920x1080-1014-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/som-construction-disturbance-3level-1920x1080-1014-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/som-construction-disturbance-3level-1920x1080-1014-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/som-construction-disturbance-3level-1920x1080-1014.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of October, 14, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>14<\/th><th>Tue<br>15<\/th><th>Wed<br>16<\/th><th>Thu<br>17<\/th><th>Fri<br>18<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Elevator Electrical Prep<\/td><td>4<\/td><td>4<\/td><td><\/td><td><\/td><td><\/td><td>4 out of 10<\/td><\/tr><tr><td>Rough MEP<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Elevator Install<\/td><td><\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">October 7, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/ehsl-construction-disturbance-level-1920x1080-4level1007.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/ehsl-construction-disturbance-level-1920x1080-4level1007-1024x576.jpg\" alt=\"\" class=\"wp-image-16038\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/ehsl-construction-disturbance-level-1920x1080-4level1007-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/ehsl-construction-disturbance-level-1920x1080-4level1007-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/ehsl-construction-disturbance-level-1920x1080-4level1007-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/ehsl-construction-disturbance-level-1920x1080-4level1007-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/10\/ehsl-construction-disturbance-level-1920x1080-4level1007.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of October, 7, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>7<\/th><th>Tue<br>8<\/th><th>Wed<br>9<\/th><th>Thu<br>10<\/th><th>Fri<br>11<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Roof Finish Work<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>North Entrance-Steel<\/td><td><\/td><td>8<\/td><td>8<\/td><td>8<\/td><td><\/td><td>8 out of 10<\/td><\/tr><tr><td>Framing Upper Level<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td><\/td><td><\/td><td>8 out of 10<\/td><\/tr><tr><td>MEP in Framed Walls<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">September 30, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0930.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0930-1024x576.jpg\" alt=\"\" class=\"wp-image-16031\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0930-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0930-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0930-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0930-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0930.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of September, 30, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>30<\/th><th>Tue<br>1<\/th><th>Wed<br>2<\/th><th>Thu<br>3<\/th><th>Fri<br>4<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Elevator Safety Install\/Electrical<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Roof Finish Work<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Steel Install<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Framing Upper Level<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">September 23, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0923.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0923-1024x576.jpg\" alt=\"\" class=\"wp-image-16018\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0923-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0923-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0923-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0923-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0923.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of September, 23, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>23<\/th><th>Tue<br>24<\/th><th>Wed<br>25<\/th><th>Thu<br>26<\/th><th>Fri<br>27<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Framing Main Level<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td><\/td><td>7 out of 10<\/td><\/tr><tr><td>Framing Upper Level<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Pour Concrete Floor Upper Level<\/td><td>8<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>8 out of 10<\/td><\/tr><tr><td>Seismic Steel<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">September 16, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-0916.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-0916-1024x576.jpg\" alt=\"\" class=\"wp-image-16008\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-0916-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-0916-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-0916-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-0916-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-0916.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of September, 16, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>16<\/th><th>Tue<br>17<\/th><th>Wed<br>18<\/th><th>Thu<br>19<\/th><th>Fri<br>20<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Framing Lower Level<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Form &amp; Rebar Walls<\/td><td><\/td><td><\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Concrete Pour Main Level<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td><\/td><td><\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">September 9, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-5level0909.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-5level0909-1024x576.jpg\" alt=\"\" class=\"wp-image-16001\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-5level0909-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-5level0909-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-5level0909-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-5level0909-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-5level0909.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of September, 9, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>9<\/th><th>Tue<br>10<\/th><th>Wed<br>11<\/th><th>Thu<br>12<\/th><th>Fri<br>13<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Roof<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4 out of 10<\/td><\/tr><tr><td>Form &amp; Rebar Walls<\/td><td>5<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>5 out of 10<\/td><\/tr><tr><td>Concrete Pour Main Level<\/td><td><\/td><td><\/td><td>5<\/td><td><\/td><td><\/td><td>5 out of 10<\/td><\/tr><tr><td>Rough Mechanical &amp; Plumbing<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Seismic Steel<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">September 2, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0903.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0903-1024x576.jpg\" alt=\"\" class=\"wp-image-15996\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0903-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0903-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0903-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0903-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/09\/ehsl-construction-disturbance-level-1920x1080-4level0903.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of September, 2, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>2<\/th><th>Tue<br>3<\/th><th>Wed<br>4<\/th><th>Thu<br>5<\/th><th>Fri<br>6<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Pipe Insulation<\/td><td><\/td><td>4<\/td><td>4<\/td><td><\/td><td><\/td><td>4 out of 10<\/td><\/tr><tr><td>Form &amp; Rebar South Shear Wall Both Floors<\/td><td><\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Roof Curb &amp; Walls<\/td><td><\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Seismic Steel<\/td><td><\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">August 26, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0826.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0826-1024x576.jpg\" alt=\"\" class=\"wp-image-15974\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0826-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0826-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0826-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0826-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0826.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of August, 26, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>26<\/th><th>Tue<br>27<\/th><th>Wed<br>28<\/th><th>Thu<br>29<\/th><th>Fri<br>30<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Seismic Steel<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Form Walls Both Floors<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Pour Concrete<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td><\/td><td>10 out of 10<\/td><\/tr><tr><td>Roof Install<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">August 19, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0819.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0819-1024x576.jpg\" alt=\"\" class=\"wp-image-15960\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0819-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0819-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0819-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0819-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0819.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of August, 19, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>19<\/th><th>Tue<br>20<\/th><th>Wed<br>21<\/th><th>Thu<br>22<\/th><th>Fri<br>23<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Mechanical Upper Level<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td><\/td><td>7 out of 10<\/td><\/tr><tr><td>Form &amp; Rebar Shear Wall Both Floors<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Seismic Steel<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><tr><td>Roof Work<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">August 12, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-5level0812.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-5level0812-1024x576.jpg\" alt=\"\" class=\"wp-image-15924\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-5level0812-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-5level0812-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-5level0812-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-5level0812-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-5level0812.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of August, 12, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>12<\/th><th>Tue<br>13<\/th><th>Wed<br>14<\/th><th>Thu<br>15<\/th><th>Fri<br>16<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Mechanical Upper Level<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Form &amp; Rebar Install Shotcrete Upper Level<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Roof Steel<\/td><td>10<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>10 out of 10<\/td><\/tr><tr><td>Seismic Steel<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><tr><td>Roof Work<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">August 5, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0802.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0802-1024x576.jpg\" alt=\"\" class=\"wp-image-15858\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0802-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0802-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0802-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0802-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/08\/ehsl-construction-disturbance-level-1920x1080-4level0802.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of August, 5, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>5<\/th><th>Tue<br>6<\/th><th>Wed<br>7<\/th><th>Thu<br>8<\/th><th>Fri<br>9<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Abatement<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4 out of 10<\/td><\/tr><tr><td>Form &amp; Rebar Install Shotcrete Upper Level<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Steel Install Across Hallways<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td><\/td><td><\/td><td>8 out of 10<\/td><\/tr><tr><td>Roof Install<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">July 29, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-4level0729.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-4level0729-1024x576.jpg\" alt=\"\" class=\"wp-image-15808\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-4level0729-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-4level0729-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-4level0729-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-4level0729-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-4level0729.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of July, 29, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>29<\/th><th>Tue<br>30<\/th><th>Wed<br>31<\/th><th>Thu<br>1<\/th><th>Fri<br>2<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Form &amp; Rebar Shotcrete Upper Level<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Baseboard South Stair<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Mechanical Upper Level<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Roof Install<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">July 22, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-0722.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-0722-1024x576.jpg\" alt=\"\" class=\"wp-image-15777\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-0722-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-0722-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-0722-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-0722-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-0722.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of July, 22, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>22<\/th><th>Tue<br>23<\/th><th>Wed<br>24<\/th><th>Thu<br>25<\/th><th>Fri<br>26<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Abatement<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2 out of 10<\/td><\/tr><tr><td>Shotcrete Pour<\/td><td>7<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>7 out of 10<\/td><\/tr><tr><td>Roof Work<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">July 15, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-4level0712.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-4level0712-1024x576.jpg\" alt=\"\" class=\"wp-image-15752\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-4level0712-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-4level0712-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-4level0712-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-4level0712-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-4level0712.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of July, 15, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>15<\/th><th>Tue<br>16<\/th><th>Wed<br>17<\/th><th>Thu<br>18<\/th><th>Fri<br>19<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Gypsum Board<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Roof Phase 1<\/td><td>10<\/td><td>10<\/td><td><\/td><td><\/td><td><\/td><td>10 out of 10<\/td><\/tr><tr><td>Roof Phase 2<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><tr><td>Roof Phase 3<\/td><td><\/td><td><\/td><td><\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">July 8, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-0708.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-0708-1024x576.jpg\" alt=\"\" class=\"wp-image-15748\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-0708-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-0708-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-0708-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-0708-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/07\/ehsl-construction-disturbance-level-1920x1080-0708.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of July, 8, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>8<\/th><th>Tue<br>9<\/th><th>Wed<br>10<\/th><th>Thu<br>11<\/th><th>Fri<br>12<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Rough MEP South Stair<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Roof Phase 1<\/td><td><\/td><td>9<\/td><td>9<\/td><td>9<\/td><td>9<\/td><td>9 out of 10<\/td><\/tr><tr><td>Roof Phase 2<\/td><td><\/td><td><\/td><td>9<\/td><td>9<\/td><td>9<\/td><td>9 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">July 1, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0701.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0701-1024x576.jpg\" alt=\"\" class=\"wp-image-15732\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0701-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0701-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0701-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0701-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0701.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of July, 1, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>1<\/th><th>Tue<br>2<\/th><th>Wed<br>3<\/th><th>Thu<br>4<\/th><th>Fri<br>5<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Demo\/Rough Electrical<br>Rough HVAC<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td><\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Form &amp; Rebar Install Shortcrete Main Level<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td><\/td><td><\/td><td>7 out of 10<\/td><\/tr><tr><td>Framing South Stair<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td><\/td><td><\/td><td>7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">June 24, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0624.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0624-1024x576.jpg\" alt=\"\" class=\"wp-image-15727\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0624-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0624-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0624-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0624-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0624.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of June, 24, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>24<\/th><th>Tue<br>25<\/th><th>Wed<br>26<\/th><th>Thu<br>27<\/th><th>Fri<br>28<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Rebar for Shear Wall Main Level<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Steel Install South Stair<\/td><td>7<\/td><td>7<\/td><td><\/td><td><\/td><td><\/td><td>7 out of 10<\/td><\/tr><tr><td>Framing South Stair<\/td><td><\/td><td><\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">June 17, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0617.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0617-1024x576.jpg\" alt=\"\" class=\"wp-image-15700\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0617-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0617-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0617-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0617-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-0617.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of June, 17, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>17<\/th><th>Tue<br>18<\/th><th>Wed<br>19<\/th><th>Thu<br>20<\/th><th>Fri<br>21<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Demo &amp; Rough Electrical<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Demo\/Rough HVAC for Exhaust Fans<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>South Stair Rebar &amp; Shotcrete<\/td><td>8<\/td><td>8<\/td><td><\/td><td><\/td><td><\/td><td>8 out of 10<\/td><\/tr><tr><td>Install Steel Main Floor<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">June 10, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-5level0610.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-5level0610-1024x576.jpg\" alt=\"\" class=\"wp-image-15694\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-5level0610-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-5level0610-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-5level0610-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-5level0610-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/06\/ehsl-construction-disturbance-level-1920x1080-5level0610.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of June, 10, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>10<\/th><th>Tue<br>11<\/th><th>Wed<br>12<\/th><th>Thu<br>13<\/th><th>Fri<br>14<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Demo &amp; Rough Electrical<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Demo\/Rough HVAC for Exhaust Fans<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Form &amp; Rebar for Shotcrete Lower Level<\/td><td>5<\/td><td>5<\/td><td><\/td><td><\/td><td><\/td><td>5 out of 10<\/td><\/tr><tr><td>South Stair Rebar &amp; Shotcrete<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td><\/td><td><\/td><td>6 out of 10<\/td><\/tr><tr><td>Install Steel Main Level<\/td><td><\/td><td><\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">June 3, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-4level0603.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-4level0603-1024x576.jpg\" alt=\"\" class=\"wp-image-15689\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-4level0603-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-4level0603-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-4level0603-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-4level0603-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-4level0603.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of June, 3, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>3<\/th><th>Tue<br>4<\/th><th>Wed<br>5<\/th><th>Thu<br>6<\/th><th>Fri<br>7<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Demo &amp; Rough Electrical<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Demo\/Rough HVAC for Exhaust Fans<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Form &amp; Rebar for Shotcrete Lower Level<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>South Stair Rebar &amp; Shotcrete<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">May 27, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0527.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0527-1024x576.jpg\" alt=\"\" class=\"wp-image-15685\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0527-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0527-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0527-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0527-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0527.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of May, 27, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>27<\/th><th>Tue<br>28<\/th><th>Wed<br>29<\/th><th>Thu<br>30<\/th><th>Fri<br>31<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Form &amp; Rebar Work Shotcrete Walls Lower Level<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>South Wall Shotcrete\/All Thread<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">May 13, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0513.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0513-1024x576.jpg\" alt=\"\" class=\"wp-image-15637\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0513-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0513-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0513-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0513-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0513.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of May, 13, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>13<\/th><th>Tue<br>14<\/th><th>Wed<br>15<\/th><th>Thu<br>16<\/th><th>Fri<br>17<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Relief Fans<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Roof Phase 1<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Structural Steel<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Demo\/Shoring South Stair<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">May 6, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0506.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0506-1024x576.jpg\" alt=\"\" class=\"wp-image-15571\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0506-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0506-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0506-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0506-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/05\/ehsl-construction-disturbance-level-1920x1080-0506.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of May, 6, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>29<\/th><th>Tue<br>30<\/th><th>Wed<br>1<\/th><th>Thu<br>2<\/th><th>Fri<br>3<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Abatement<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2 out of 10<\/td><\/tr><tr><td>Underground Plumbing<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>Relief Fans<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Roof Phase 1<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Structural Steel<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">April 29, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-5level0429.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-5level0429-1024x576.jpg\" alt=\"\" class=\"wp-image-15547\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-5level0429-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-5level0429-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-5level0429-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-5level0429-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-5level0429.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of April, 29, 2024<br><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>29<\/th><th>Tue<br>30<\/th><th>Wed<br>1<\/th><th>Thu<br>2<\/th><th>Fri<br>3<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Abatement<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2 out of 10<\/td><\/tr><tr><td>Waterproofing<\/td><td>3<\/td><td>3<\/td><td><\/td><td><\/td><td><\/td><td>3 out of 10<\/td><\/tr><tr><td>Start up for Relief Fans<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>Form\/Rebar for Mat Flooring<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Excavation<\/td><td>7<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">April 22, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-4levels0422.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-4levels0422-1024x576.jpg\" alt=\"\" class=\"wp-image-15497\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-4levels0422-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-4levels0422-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-4levels0422-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-4levels0422-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-4levels0422.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of April, 22, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>22<\/th><th>Tue<br>23<\/th><th>Wed<br>24<\/th><th>Thu<br>25<\/th><th>Fri<br>26<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Waterproofing &amp; Underground Plumbing<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>Abatement<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Demo\/Rough HVAC for Exhaust Fans<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Excavation<\/td><td>7<\/td><td>7<\/td><td><\/td><td><\/td><td><\/td><td>7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">April 15, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-4levels-0415.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-4levels-0415-1024x576.jpg\" alt=\"\" class=\"wp-image-15462\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-4levels-0415-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-4levels-0415-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-4levels-0415-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-4levels-0415-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-4levels-0415.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of April, 15, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>15<\/th><th>Tue<br>16<\/th><th>Wed<br>17<\/th><th>Thu<br>18<\/th><th>Fri<br>19<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Controls for Relief Fans<\/td><td><\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>Duct Work for Exhaust Fans<\/td><td>6<\/td><td>6<\/td><td><\/td><td><\/td><td><\/td><td>6 out of 10<\/td><\/tr><tr><td>Demo\/Rough HVAC for Exhaust Fans<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Excavation<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">April 8, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-0408.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-0408-1024x576.jpg\" alt=\"\" class=\"wp-image-15350\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-0408-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-0408-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-0408-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-0408-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/04\/ehsl-construction-disturbance-level-1920x1080-0408.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of April, 8, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>8<\/th><th>Tue<br>9<\/th><th>Wed<br>10<\/th><th>Thu<br>11<\/th><th>Fri<br>12<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Demo\/Rough HVAC for Exhaust Fans<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Excavation<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">April 1, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0401.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0401-1024x576.jpg\" alt=\"\" class=\"wp-image-15261\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0401-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0401-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0401-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0401-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0401.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of April, 1, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>1<\/th><th>Tue<br>2<\/th><th>Wed<br>3<\/th><th>Thu<br>4<\/th><th>Fri<br>5<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Demo\/Rough HVAC for Exhaust Fans<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Lower Level Closed<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Excavation<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">March 25, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0325.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0325-1024x576.jpg\" alt=\"\" class=\"wp-image-15251\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0325-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0325-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0325-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0325-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0325.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of March, 25, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>25<\/th><th>Tue<br>26<\/th><th>Wed<br>27<\/th><th>Thu<br>28<\/th><th>Fri<br>29<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Move roof relief air fans<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Excavation<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Demo footings<\/td><td>10<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">March 18, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0318.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0318-1024x576.jpg\" alt=\"\" class=\"wp-image-15202\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0318-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0318-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0318-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0318-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0318.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of March, 18, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>18<\/th><th>Tue<br>19<\/th><th>Wed<br>20<\/th><th>Thu<br>21<\/th><th>Fri<br>22<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Demo main floor steel<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td><\/td><td><\/td><td>6 out of 10<\/td><\/tr><tr><td>Demo concrete on lower level<\/td><td><\/td><td><\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">March 11, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0311.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0311-1024x576.jpg\" alt=\"\" class=\"wp-image-15177\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0311-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0311-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0311-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0311-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-0311.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of March, 11, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>11<\/th><th>Tue<br>12<\/th><th>Wed<br>13<\/th><th>Thu<br>14<\/th><th>Fri<br>15<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Demo main floor steel<\/td><td><\/td><td><\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Steel for exhaust fans<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td><\/td><td><\/td><td>8 out of 10<\/td><\/tr><tr><td>Demo main floor concrete<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td><\/td><td><\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">March 4, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-0304.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-0304-1024x576.jpg\" alt=\"\" class=\"wp-image-15155\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-0304-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-0304-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-0304-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-0304-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/03\/ehsl-construction-disturbance-level-1920x1080-4levels-0304.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of March, 4, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>4<\/th><th>Tue<br>5<\/th><th>Wed<br>6<\/th><th>Thu<br>7<\/th><th>Fri<br>8<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Fire Sprinklers<\/td><td>5<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>5 out of 10<\/td><\/tr><tr><td>Steel for exhaust fans<\/td><td><\/td><td><\/td><td><\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Demo Upper Floor Steel<\/td><td>10<\/td><td>10<\/td><td><\/td><td><\/td><td><\/td><td>10 out of 10<\/td><\/tr><tr><td>Demo Main Floor Concrete<\/td><td><\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">February<\/mark><\/strong> <strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">26, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0226.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0226-1024x576.jpg\" alt=\"\" class=\"wp-image-15139\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0226-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0226-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0226-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0226-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0226.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of Feb, 26, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>26<\/th><th>Tue<br>27<\/th><th>Wed<br>28<\/th><th>Thu<br>29<\/th><th>Fri<br>1<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Electrical Demo\/Rough Electrical<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Demo\/Rough HVAC for exhaust fans<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Rough Plumbing<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Demo Upper Floor<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">February<\/mark><\/strong> <strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">19, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><br><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0219.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0219-1024x576.jpg\" alt=\"\" class=\"wp-image-15112\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0219-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0219-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0219-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0219-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0219.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of Feb, 19, 2024<br><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>19<\/th><th>Tue<br>20<\/th><th>Wed<br>21<\/th><th>Thu<br>22<\/th><th>Fri<br>23<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Electrical Demo\/Rough Electrical<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Demo\/Rough HVAC for exhaust fans<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Rough Plumbing<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Steel for exhaust fans<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td><\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/992x300-ehsl-banner-rotators4-0219.png\"><img loading=\"lazy\" decoding=\"async\" width=\"992\" height=\"300\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/992x300-ehsl-banner-rotators4-0219.png\" alt=\"\" class=\"wp-image-15114\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/992x300-ehsl-banner-rotators4-0219.png 992w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/992x300-ehsl-banner-rotators4-0219-300x91.png 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/992x300-ehsl-banner-rotators4-0219-768x232.png 768w\" sizes=\"auto, (max-width: 992px) 100vw, 992px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Sciences Library will be having a wifi outage on Monday February 19, 2024 from 6AM to about 8:30AM.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">February<\/mark><\/strong> <strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">12, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0212.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0212-1024x576.jpg\" alt=\"\" class=\"wp-image-15083\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0212-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0212-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0212-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0212-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0212.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Health Library construction disturbance level for the week of Feb, 12, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>12<\/th><th>Tue<br>13<\/th><th>Wed<br>14<\/th><th>Thu<br>15<\/th><th>Fri<br>16<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Rough Plumbing<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Electrical Demo\/Rough Electrical<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Demo\/Rough HVAC for exhaust fans<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Steel Install upper core\/main floor<br>Steel for exhaust fans<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">February<\/mark><\/strong> <strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">5, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0205.jpg\"><img decoding=\"async\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/02\/ehsl-construction-disturbance-level-1920x1080-0205-1024x576.jpg\" alt=\"\" class=\"wp-image-15056\"\/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Feb, 5, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>5<\/th><th>Tue<br>6<\/th><th>Wed<br>7<\/th><th>Thu<br>8<\/th><th>Fri<br>9<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Steel Abatement <\/td><td><\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2 out of 10<\/td><\/tr><tr><td>Rough Plumbing<\/td><td><\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Electrical Demo\/Rough Electrical<\/td><td><\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Steel Install around core<\/td><td><\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">January 29, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0129.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0129-1024x576.jpg\" alt=\"\" class=\"wp-image-15051\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0129-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0129-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0129-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0129-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-4levels-0129.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Jan, 29, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>29<\/th><th>Tue<br>30<\/th><th>Wed<br>31<\/th><th>Thu<br>1<\/th><th>Fri<br>2<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Steel Abatement <\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2 out of 10<\/td><\/tr><tr><td>UIT Relocation<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>Rough Plumbing<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Steel Install around core<br>Electrical Demo\/Rough Electrical<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">January 22, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0122.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0122-1024x576.jpg\" alt=\"\" class=\"wp-image-15044\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0122-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0122-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0122-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0122-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0122.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Jan, 22, 2024<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>22<\/th><th>Tue<br>23<\/th><th>Wed<br>24<\/th><th>Thu<br>25<\/th><th>Fri<br>26<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Steel Abatement <\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2<\/td><td>2 out of 10<\/td><\/tr><tr><td>UIT Relocation<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>Mechanical Demo\/Rerouting<br>Rough Plumbing<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">January 15, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0115.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0115-1024x576.jpg\" alt=\"\" class=\"wp-image-15038\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0115-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0115-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0115-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0115-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0115.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Jan, 15, 2024<br><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>15<\/th><th>Tue<br>16<\/th><th>Wed<br>17<\/th><th>Thu<br>18<\/th><th>Fri<br>19<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Steel Abatement around core<br>Electrical Demo\/Rough Electrical<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Mechanical Demo\/Rerouting<br>Rough Plumbing<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Demo concrete columns\/walls<br>Core Drilling for UIT <\/td><td>10<\/td><td>10<\/td><td>10<\/td><td><\/td><td><\/td><td>10 out of 10<\/td><\/tr><tr><td>Micropiles in basement<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">January 8, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0108.jpg\"><img decoding=\"async\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0108-1024x576.jpg\" alt=\"\" class=\"wp-image-15029\"\/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Jan, 8, 2024<br><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>8<\/th><th>Tue<br>9<\/th><th>Wed<br>10<\/th><th>Thu<br>11<\/th><th>Fri<br>12<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>UIT Relocation<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>Rough Plumbing\/Electrical Demo<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Drywall &amp; Steel Abatement <\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Demo South Stair<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">January 1, 2024<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0101.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0101-1024x576.jpg\" alt=\"\" class=\"wp-image-15024\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0101-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0101-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0101-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0101-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2024\/01\/ehsl-construction-disturbance-level-1920x1080-0101.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Jan, 1, 2024<br><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>1<\/th><th>Tue<br>2<\/th><th>Wed<br>3<\/th><th>Thu<br>4<\/th><th>Fri<br>5<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>UIT Relocation<\/td><td><\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>Rough Plumbing\/Electrical Demo<\/td><td><\/td><td>4<\/td><td> 4<\/td><td>4<\/td><td>4<\/td><td>4 out of 10<\/td><\/tr><tr><td>Drywall Abatement &amp; Mechanical Demo\/Rerouting<\/td><td><\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Demolition of Concrete &amp; Walls<\/td><td><\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">December 25, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1225.jpg\"><img decoding=\"async\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1225-1024x576.jpg\" alt=\"\" class=\"wp-image-15021\"\/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Dec, 25, 2023<br><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>25<\/th><th>Tue<br>26<\/th><th>Wed<br>27<\/th><th>Thu<br>28<\/th><th>Fri<br>29<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>UIT Relocation<\/td><td><\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>Rough Plumbing\/Electrical Demo<\/td><td><\/td><td>4<\/td><td> 4<\/td><td>4<\/td><td>4<\/td><td>4 out of 10<\/td><\/tr><tr><td>Drywall Abatement &amp; Mechanical Demo\/Rerouting<\/td><td><\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Demolition of Concrete &amp; Walls<\/td><td><\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10<\/td><td>10 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">December 18, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1218.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1218-1024x576.jpg\" alt=\"\" class=\"wp-image-14991\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1218-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1218-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1218-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1218-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1218.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Dec, 18, 2023<br><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>11<\/th><th>Tue<br>12<\/th><th>Wed<br>13<\/th><th>Thu<br>14<\/th><th>Fri<br>15<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Drywall Abatement<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Mechanical Demo\/Rerouting<\/td><td>5<\/td><td>5<\/td><td> 5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Rough Plumbing<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Electrical Demo<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">December 13, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1213.jpg\"><img decoding=\"async\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1213-1024x576.jpg\" alt=\"\" class=\"wp-image-14978\"\/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Dec, 13, 2023<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>11<\/th><th>Tue<br>12<\/th><th>Wed<br>13<\/th><th>Thu<br>14<\/th><th>Fri<br>15<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Drywall Abatement<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Demo Salvaged Store Front<\/td><td><\/td><td><\/td><td> 5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Mechanical Demo<\/td><td><\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Rough Plumbing &amp; Electrical Demo<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">December 4, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1204.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1204-1024x576.jpg\" alt=\"\" class=\"wp-image-14963\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1204-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1204-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1204-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1204-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/12\/ehsl-construction-disturbance-level-1920x1080-1204.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Dec, 4, 2023<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>4<\/th><th>Tue<br>5<\/th><th>Wed<br>6<\/th><th>Thu<br>7<\/th><th>Fri<br>8<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Set up temp walls\/demo salvaged items<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>UIT Relocation<\/td><td>3<\/td><td>3<\/td><td> 3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>MEP Demo\/Evaluation &amp; Fire Sprinkler relocation<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Drywall Abatement<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">November 27, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><br><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1127.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1127-1024x576.jpg\" alt=\"\" class=\"wp-image-14954\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1127-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1127-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1127-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1127-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1127.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Nov, 27, 2023<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>27<\/th><th>Tue<br>28<\/th><th>Wed<br>29<\/th><th>Thu<br>30<\/th><th>Fri<br>1<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Phase 2 Mob<\/td><td>1<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>1 out of 10<\/td><\/tr><tr><td>Phase 2 Temp Walls<\/td><td><\/td><td>1<\/td><td> 1<\/td><td>1<\/td><td>1<\/td><td>1 out of 10<\/td><\/tr><tr><td>Phase 2 Selective Demo\/Salvaged Items<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>2<\/td><td>2 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">November 20, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1120.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1120-1024x576.jpg\" alt=\"\" class=\"wp-image-14902\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1120-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1120-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1120-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1120-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1120.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Nov, 20, 2023<br><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>20<\/th><th>Tue<br>21<\/th><th>Wed<br>22<\/th><th>Thu<br>23<\/th><th>Fri<br>24<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Taking Down Phase 1 Panels<\/td><td>1<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>1 out of 10<\/td><\/tr><tr><td>Punch List\/Cleaning<\/td><td>1<\/td><td>1<\/td><td> 1<\/td><td><\/td><td><\/td><td>1 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">November 13, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1113-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1113-1-1024x576.jpg\" alt=\"\" class=\"wp-image-14900\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1113-1-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1113-1-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1113-1-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1113-1-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/ehsl-construction-disturbance-level-1920x1080-1113-1.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Nov, 13, 2023<br><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>13<\/th><th>Tue<br>14<\/th><th>Wed<br>15<\/th><th>Thu<br>16<\/th><th>Fri<br>17<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Finish Electrical<\/td><td>1<\/td><td>1<\/td><td>1<\/td><td>1<\/td><td>1<\/td><td>1 out of 10<\/td><\/tr><tr><td>Acoustical Ceiling Grid\/Tiles<\/td><td>3<\/td><td>3<\/td><td><\/td><td><\/td><td><\/td><td>3 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">November 6, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/som-construction-disturbance-level-1920x1080-1030-1106.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/som-construction-disturbance-level-1920x1080-1030-1106-1024x576.jpg\" alt=\"\" class=\"wp-image-14890\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/som-construction-disturbance-level-1920x1080-1030-1106-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/som-construction-disturbance-level-1920x1080-1030-1106-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/som-construction-disturbance-level-1920x1080-1030-1106-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/som-construction-disturbance-level-1920x1080-1030-1106-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/11\/som-construction-disturbance-level-1920x1080-1030-1106.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Nov, 6, 2023<br><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>6<\/th><th>Tue<br>7<\/th><th>Wed<br>8<\/th><th>Thu<br>9<\/th><th>Fri<br>10<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Reinstall wood panels<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">October 30, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-1030.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-1030-1024x576.jpg\" alt=\"\" class=\"wp-image-14886\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-1030-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-1030-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-1030-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-1030-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-1030.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Oct, 30, 2023<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>30<\/th><th>Tue<br>31<\/th><th>Wed<br>1<\/th><th>Thu<br>2<\/th><th>Fri<br>3<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Reinstall wood panels<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">October 23, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-1023.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-1023-1024x576.jpg\" alt=\"\" class=\"wp-image-14880\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-1023-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-1023-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-1023-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-1023-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-1023.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Oct, 23, 2023<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>23<\/th><th>Tue<br>24<\/th><th>Wed<br>25<\/th><th>Thu<br>26<\/th><th>Fri<br>27<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Reinstall wood panels<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:#ffffff\" class=\"has-inline-color has-vivid-red-color\">October 16, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-101623.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-101623-1024x576.jpg\" alt=\"\" class=\"wp-image-14873\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-101623-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-101623-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-101623-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-101623-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/som-construction-disturbance-level-1920x1080-101623.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Oct, 16, 2023<br><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>16<\/th><th>Tue<br>17<\/th><th>Wed<br>18<\/th><th>Thu<br>19<\/th><th>Fri<br>20<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Framing<\/td><td>6<\/td><td>6<\/td><td><\/td><td><\/td><td><\/td><td>6 out of 10<\/td><\/tr><tr><td>Reroof<\/td><td>4<\/td><td>4<\/td><td><\/td><td><\/td><td><\/td><td>4 out of 10<\/td><\/tr><tr><td>Installing gyp board<br>(constant drilling)<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:#ffffff\" class=\"has-inline-color has-vivid-red-color\">October 9, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/ehsl-construction-disturbance-level-1920x1080-Oct09.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/ehsl-construction-disturbance-level-1920x1080-Oct09-1024x576.jpg\" alt=\"\" class=\"wp-image-14871\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/ehsl-construction-disturbance-level-1920x1080-Oct09-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/ehsl-construction-disturbance-level-1920x1080-Oct09-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/ehsl-construction-disturbance-level-1920x1080-Oct09-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/ehsl-construction-disturbance-level-1920x1080-Oct09-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/10\/ehsl-construction-disturbance-level-1920x1080-Oct09.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Oct, 9, 2023<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>9<\/th><th>Tue<br>10<\/th><th>Wed<br>11<\/th><th>Thu<br>12<\/th><th>Fri<br>13<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Insulation<strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\"><\/mark><\/strong><\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td><\/td><td>3 out of 10<\/td><\/tr><tr><td>Rough Electrical<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>Reroof<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td><\/td><td>4 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p id=\"week39\"><strong><mark style=\"background-color:#ffffff\" class=\"has-inline-color has-vivid-red-color\">September 25, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><br><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level_2023_week39.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level_2023_week39-1024x576.jpg\" alt=\"Eccles Library Construction Disturbance Level for Week 39, 2023\" class=\"wp-image-14848\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level_2023_week39-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level_2023_week39-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level_2023_week39-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level_2023_week39-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level_2023_week39.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Eccles Library Construction Disturbance Level for Week 39, 2023<\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>18<\/th><th>Tue<br>19<\/th><th>Wed<br>20<\/th><th>Thu<br>21<\/th><th>Fri<br>22<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Structural Steel at Roof<br><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">*<\/mark><\/strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">Use of &#8220;puncture gun&#8221; sound can resemble gunshots<\/mark><\/td><td><\/td><td><\/td><td><\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Shotcrete Rebar Drilling<\/td><td><\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Sewer<\/td><td><\/td><td><\/td><td>TBD<\/td><td>TBD<\/td><td>TBD<\/td><td>TBD<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:#ffffff\" class=\"has-inline-color has-vivid-red-color\">September 18, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><br><\/p>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Sept, 18, 2023<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level-1920x1080-230918.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level-1920x1080-230918-1024x576.jpg\" alt=\"\" class=\"wp-image-14795\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level-1920x1080-230918-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level-1920x1080-230918-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level-1920x1080-230918-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level-1920x1080-230918-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level-1920x1080-230918.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>18<\/th><th>Tue<br>19<\/th><th>Wed<br>20<\/th><th>Thu<br>21<\/th><th>Fri<br>22<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Structural Steel Welding<br><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">*Potential fumes<\/mark><\/strong><\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><tr><td>Structural Steel Roof<br><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">*<\/mark><\/strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">Use of &#8220;puncture gun&#8221;, sound can resemble gunshots<\/mark><\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Structural Steel Bent Plate<br>(Drilling)<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Shotcrete Rebar Drilling<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/992x300-ehsl-banner-rotators-3.png\"><img loading=\"lazy\" decoding=\"async\" width=\"992\" height=\"300\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/992x300-ehsl-banner-rotators-3.png\" alt=\"\" class=\"wp-image-14740\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/992x300-ehsl-banner-rotators-3.png 992w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/992x300-ehsl-banner-rotators-3-300x91.png 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/992x300-ehsl-banner-rotators-3-768x232.png 768w\" sizes=\"auto, (max-width: 992px) 100vw, 992px\" \/><\/a><\/figure>\n\n\n\n<p>The next phase of the seismic retrofit will be attaching the steel plates to the roof. This involves the use of a <strong><em>&#8216;puncture gun&#8217; which can sometimes resemble the sound of gunshots<\/em><\/strong>. This will take place in EHSL from Friday September 15 through the 22.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/992x300-ehsl-banner-rotators-1-1.png\"><img loading=\"lazy\" decoding=\"async\" width=\"992\" height=\"300\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/992x300-ehsl-banner-rotators-1-1.png\" alt=\"\" class=\"wp-image-14736\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/992x300-ehsl-banner-rotators-1-1.png 992w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/992x300-ehsl-banner-rotators-1-1-300x91.png 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/992x300-ehsl-banner-rotators-1-1-768x232.png 768w\" sizes=\"auto, (max-width: 992px) 100vw, 992px\" \/><\/a><\/figure>\n\n\n\n<p>Structural steel welding could cause possible fumes inside EHSL from September 11 &#8211; 15, 2023<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:#ffffff\" class=\"has-inline-color has-vivid-red-color\">September 11, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level-1920x1080-3-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level-1920x1080-3-1-1024x576.jpg\" alt=\"\" class=\"wp-image-14734\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level-1920x1080-3-1-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level-1920x1080-3-1-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level-1920x1080-3-1-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level-1920x1080-3-1-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level-1920x1080-3-1.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Sept, 11, 2023<br><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>11<\/th><th>Tue<br>12<\/th><th>Wed<br>13<\/th><th>Thu<br>14<\/th><th>Fri<br>15<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Steel Plates<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4<\/td><td>4 out of 10<\/td><\/tr><tr><td>Structural Steel Roof<br><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">*<\/mark><\/strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">Use of &#8220;puncture gun&#8221;, sound can resemble gunshots<\/mark><\/td><td><\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Structural Steel Welding<br><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">*Potential fumes<\/mark><\/strong> <\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">September 4, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/ehsl-construction-disturbance-level-1920x1080-1-1.jpg\"><img decoding=\"async\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/09\/ehsl-construction-disturbance-level-2-1920x1080-.jpg\" alt=\"EHSL Construction Disturbance\"\/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Sept, 4, 2023<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>4<\/th><th>Tue<br>5<\/th><th>Wed<br>6<\/th><th>Thu<br>7<\/th><th>Fri<br>8<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Steel Install<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Drilling for rebar<\/td><td><\/td><td><\/td><td>8<\/td><td>8<\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><tr><td>Structural Steel Welding<br><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">*Potential fumes<\/mark><\/strong> <\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">August 28, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/ehsl-construction-disturbance-level-1920x1080-2.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/ehsl-construction-disturbance-level-1920x1080-2-1024x576.jpg\" alt=\"EHSL Construction Disturbance\" class=\"wp-image-14703\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/ehsl-construction-disturbance-level-1920x1080-2-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/ehsl-construction-disturbance-level-1920x1080-2-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/ehsl-construction-disturbance-level-1920x1080-2-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/ehsl-construction-disturbance-level-1920x1080-2-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/ehsl-construction-disturbance-level-1920x1080-2.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Eccles Sciences Health Library construction disturbance level for the week of Aug, 28, 2023<br><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>28<\/th><th>Tue<br>29<\/th><th>Wed<br>30<\/th><th>Thu<br>31<\/th><th>Fri<br>1<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Steel Layout\/drilling<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td><\/td><td><\/td><td>6 out of 10<\/td><\/tr><tr><td>Steel Install <\/td><td><\/td><td><\/td><td><\/td><td>7<\/td><td>7<\/td><td>7 out of 10<\/td><\/tr><tr><td>Sewer Install<\/td><td>8<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6<\/td><td>6 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">August 21, 2023<\/mark><\/strong> | <strong>EHSL Construction update<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/construction_update_082123.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"992\" height=\"300\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/construction_update_082123.jpg\" alt=\"\" class=\"wp-image-14693\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/construction_update_082123.jpg 992w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/construction_update_082123-300x91.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/construction_update_082123-768x232.jpg 768w\" sizes=\"auto, (max-width: 992px) 100vw, 992px\" \/><\/a><figcaption class=\"wp-element-caption\">Steel beam fabrication is complete so they will begin installing in the southeast corner of the Main Level on Monday August 21, 2023 and will last all week. This will be disruptive as they will be drilling holes in the concrete to install. There are noise cancelling headphones available at the front desk. <\/figcaption><\/figure>\n\n\n\n<p><br><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">August 21, 2023<\/mark><\/strong> | <strong>Eccles School of Medicine construction disturbance level for the wee<\/strong>k.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.23.SOM-Construction-Disturbance-Level.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.23.SOM-Construction-Disturbance-Level-1024x576.jpg\" alt=\"Eccles School of Medicine construction disturbance level for the week of Aug, 21, 2023\" class=\"wp-image-14688\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.23.SOM-Construction-Disturbance-Level-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.23.SOM-Construction-Disturbance-Level-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.23.SOM-Construction-Disturbance-Level-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.23.SOM-Construction-Disturbance-Level-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.23.SOM-Construction-Disturbance-Level.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Eccles School of Medicine construction disturbance level for the week of Aug, 21, 2023<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>21<\/th><th>Tue<br>22<\/th><th>Wed<br>23<\/th><th>Thu<br>24<\/th><th>Fri<br>25<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>HP Pile Shoring &amp; Shotcrete Work<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Concrete Footings &amp; Foundations<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><tr><td>Demolish College of Nursing Parking Garage<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>8<\/td><td>8 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">August 14, 2023<\/mark><\/strong> | <strong>Eccles School of Medicine construction disturbance level for the wee<\/strong>k.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.14.SOM-Construction-Disturbance-Level.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.14.SOM-Construction-Disturbance-Level-1024x576.jpg\" alt=\"Eccles School of Medicine construction disturbance level for the week of Aug, 14, 2023\" class=\"wp-image-14687\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.14.SOM-Construction-Disturbance-Level-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.14.SOM-Construction-Disturbance-Level-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.14.SOM-Construction-Disturbance-Level-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.14.SOM-Construction-Disturbance-Level-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.14.SOM-Construction-Disturbance-Level.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Eccles School of Medicine construction disturbance level for the week of Aug, 14, 2023<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>14<\/th><th>Tue<br>15<\/th><th>Wed<br>16<\/th><th>Thu<br>17<\/th><th>Fri<br>18<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>HP Pile Shoring &amp; Shotcrete Work<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>Concrete Footings &amp; Foundations<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3<\/td><td>3 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h4 class=\"wp-block-heading\"><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">August 7, 2023<\/mark> | Eccles School of Medicine construction disturbance level for the week.<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.07.SOM-Construction-Disturbance-Level.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.07.SOM-Construction-Disturbance-Level-1024x576.jpg\" alt=\"Eccles School of Medicine construction disturbance level for the week of Aug, 7, 2023\" class=\"wp-image-14686\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.07.SOM-Construction-Disturbance-Level-1024x576.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.07.SOM-Construction-Disturbance-Level-300x169.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.07.SOM-Construction-Disturbance-Level-768x432.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.07.SOM-Construction-Disturbance-Level-1536x864.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/08\/2023.08.07.SOM-Construction-Disturbance-Level.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Eccles School of Medicine construction disturbance level for the week of Aug, 7, 2023<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Construction Activity<\/th><th>Mon<br>7<\/th><th>Tue<br>8<\/th><th>Wed<br>9<\/th><th>Thu<br>10<\/th><th>Fri<br>11<\/th><th>Rating<\/th><\/tr><\/thead><tbody><tr><td>Shotcrete and Soil Noils of EHSL Mechanical Room<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><tr><td>HP Pile Shoring Work<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5<\/td><td>5 out of 10<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Anticipate level variances.<\/em><\/figcaption><\/figure>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h4 class=\"wp-block-heading\"><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">July 29, 2023<\/mark> | EHSL closed during planned power outage Saturday, July 29 from 6 AM to 10 AM.<\/h4>\n\n\n\n<p>IMPACTS:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>No after-hours badge access in EHSL<\/li>\n\n\n\n<li>Study rooms available at EHSEB during this time period<\/li>\n\n\n\n<li>Turn off any connected devices requiring power<\/li>\n\n\n\n<li>Off-campus website access normal operations <\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/07\/992x300-ehsl-construction-update-july-29-2023.png\"><img loading=\"lazy\" decoding=\"async\" width=\"992\" height=\"300\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/07\/992x300-ehsl-construction-update-july-29-2023.png\" alt=\"July 29, 2023, EHSL closure from 6 am to 10 am for planned power outtage\" class=\"wp-image-14665\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/07\/992x300-ehsl-construction-update-july-29-2023.png 992w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/07\/992x300-ehsl-construction-update-july-29-2023-300x91.png 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/07\/992x300-ehsl-construction-update-july-29-2023-768x232.png 768w\" sizes=\"auto, (max-width: 992px) 100vw, 992px\" \/><\/a><\/figure>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-default\"\/>\n\n\n\n<h4 class=\"wp-block-heading\"><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">June 9-12, 2023<\/mark> | EHSL closed during planned power outage from Friday, 3 PM, June 9, until Monday, 7 AM, June 12. <\/h4>\n\n\n\n<p>IMPACTS:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>No after-hours badge access in EHSL. Please use EHSEB during this time period<\/li>\n\n\n\n<li>Turn off any connected devices requiring power<\/li>\n\n\n\n<li>Off-campus website access normal operations <\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/06\/992x300-ehsl-construction-update-june-9-1.png\"><img loading=\"lazy\" decoding=\"async\" width=\"992\" height=\"300\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/06\/992x300-ehsl-construction-update-june-9-1.png\" alt=\"Retrofit Updates June 10, 2023. EHSL closed from June 9, at 3 PM until June 12, 7 AM for a power outage.\" class=\"wp-image-14650\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/06\/992x300-ehsl-construction-update-june-9-1.png 992w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/06\/992x300-ehsl-construction-update-june-9-1-300x91.png 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/06\/992x300-ehsl-construction-update-june-9-1-768x232.png 768w\" sizes=\"auto, (max-width: 992px) 100vw, 992px\" \/><\/a><\/figure>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h4 class=\"wp-block-heading\"><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">June 5, 2023<\/mark> | Retrofit construction begins, south east corner, main and upper level.<\/h4>\n\n\n\n<p>IMPACTS:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction noise <\/li>\n\n\n\n<li><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-cyan-blue-color\">North, South and EHSEB bridge entries all accessible<\/mark><\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-retrofit-begins-20230530.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"562\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-retrofit-begins-20230530-1024x562.png\" alt=\"\" class=\"wp-image-14614\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-retrofit-begins-20230530-1024x562.png 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-retrofit-begins-20230530-300x165.png 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-retrofit-begins-20230530-768x421.png 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-retrofit-begins-20230530-1536x843.png 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-retrofit-begins-20230530.png 1866w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h4 class=\"wp-block-heading\"><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">May 24, 2023<\/mark><\/strong> | Level A access to School of Medicine (SOM) closes. Concrete removal scheduled to start.<\/h4>\n\n\n\n<p>IMPACTS: <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Level 1 south east door opens with badge access<\/li>\n\n\n\n<li>Potential concrete removal begins anticipate high-level noise, ground vibrations and disruptive working environments<\/li>\n\n\n\n<li><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-cyan-blue-color\">North, South and EHSEB bridge entries all accessible<\/mark><\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-som-level-acloses-concrete-starts-20230524-1.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"562\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-som-level-acloses-concrete-starts-20230524-1-1024x562.png\" alt=\"Level A access to School of Medicine (SOM) closes. Concrete removal scheduled to start.\" class=\"wp-image-14583\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-som-level-acloses-concrete-starts-20230524-1-1024x562.png 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-som-level-acloses-concrete-starts-20230524-1-300x165.png 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-som-level-acloses-concrete-starts-20230524-1-768x421.png 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-som-level-acloses-concrete-starts-20230524-1-1536x843.png 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-som-level-acloses-concrete-starts-20230524-1.png 1866w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h4 class=\"wp-block-heading\"><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">May 23, 2023<\/mark><\/strong> | North and South doors of EHSL replaced, main entrance closes <\/h4>\n\n\n\n<p>IMPACTS: <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>North and South doors inaccessible<\/li>\n\n\n\n<li>Main entrance closes for duration of SOM construction<\/li>\n\n\n\n<li><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-cyan-blue-color\">EHSEB bridge entry remains open<\/mark><\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-all-entrances-closed-20230523-1.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"562\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-all-entrances-closed-20230523-1-1024x562.png\" alt=\"EHSL North and South doors replaced. Access by EHSEB bridge upper level.\" class=\"wp-image-14585\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-all-entrances-closed-20230523-1-1024x562.png 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-all-entrances-closed-20230523-1-300x165.png 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-all-entrances-closed-20230523-1-768x421.png 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-all-entrances-closed-20230523-1-1536x843.png 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-all-entrances-closed-20230523-1.png 1866w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h4 class=\"wp-block-heading\"><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">May 23, 2023 |<\/mark> EHSL main and north entrance closed no card entrance. Access through the EHSEB bridge. Reopening TBA.<\/h4>\n\n\n\n<p>Due to a new doors and card reader installation at the new south entrance location.<\/p>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h4 class=\"wp-block-heading\"><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\"><strong>May 22, 2023<\/strong> <\/mark>| School of Medicine (SOM): West sidewalk closes<\/h4>\n\n\n\n<p>IMPACTS:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Access to Main level entrance closed for duration of SOM construction<\/li>\n\n\n\n<li><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-cyan-blue-color\">EHSL access restricted to EHSEB bridge and North doors<\/mark><\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-west-side-walk-close-20230522-1.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"562\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-west-side-walk-close-20230522-1-1024x562.png\" alt=\"Spencer Fox Eccles School of Medicine west side walk closes, May 22, 2023\" class=\"wp-image-14584\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-west-side-walk-close-20230522-1-1024x562.png 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-west-side-walk-close-20230522-1-300x165.png 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-west-side-walk-close-20230522-1-768x421.png 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-west-side-walk-close-20230522-1-1536x843.png 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/05\/ehsl-campus-map-west-side-walk-close-20230522-1.png 1866w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-construction-past-updates.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"120\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-construction-past-updates.jpg\" alt=\"Past Updates\" class=\"wp-image-14123\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-construction-past-updates.jpg 700w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-construction-past-updates-300x51.jpg 300w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/a><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-default\"\/>\n\n\n\n<p><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\"><strong>May 11, 2023<\/strong><\/mark><strong> |<\/strong> Phase 1: South bike racks removal<\/p>\n\n\n\n<p><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">May 8, 2023<\/mark><\/strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\"><strong> <\/strong><\/mark>| Phase 1: Furniture removal from the southeast corner on the main level.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-default\"\/>\n\n\n\n<p><strong><mark class=\"has-inline-color has-vivid-red-color\">April 17, 2023<\/mark><\/strong> | Spencer Fox Eccles School of Medicine construction perimeter fence installation. <br><br><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/transformation\/maps-directions\/\">View the construction map for impacted areas.<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-map-20230417.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"562\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-map-20230417-1024x562.png\" alt=\"Spencer Fox Eccles School of Medicine construction perimeter fence installation.\" class=\"wp-image-14356\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-map-20230417-1024x562.png 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-map-20230417-300x165.png 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-map-20230417-768x421.png 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-map-20230417-1536x843.png 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-map-20230417.png 1866w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-map-20230417.png\">Click to view the full-size image of the impacted areas.<\/a><\/figcaption><\/figure>\n\n\n\n<p>Traffic Impacts<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-traffic-map-20230417.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"562\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-traffic-map-20230417-1024x562.png\" alt=\"Spencer Fox Eccles School of Medicine construction perimeter fence traffic impact\" class=\"wp-image-14410\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-traffic-map-20230417-1024x562.png 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-traffic-map-20230417-300x165.png 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-traffic-map-20230417-768x421.png 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-traffic-map-20230417-1536x843.png 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-traffic-map-20230417.png 1866w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/04\/ehsl-esom-construction-fence-traffic-map-20230417.png\">Click to view the full-size image of the traffic impact.<\/a><\/figcaption><\/figure>\n\n\n\n<p>To see the most current information <a rel=\"noreferrer noopener\" href=\"https:\/\/map.utah.edu\/\" target=\"_blank\">https:\/\/map.utah.edu\/<\/a><\/p>\n\n\n\n<div style=\"height:26px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong><mark class=\"has-inline-color has-vivid-red-color\">March 16, 2023<\/mark><\/strong> | We have exciting news for 2023: EHSL is preparing for an earthquake retrofit! We anticipate construction changes and updates over the next three years. Stay up to date on all the details at the construction website.<\/p>\n\n\n\n<p><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/transformation\/seismic-construction-project-dates\/\">View Seismic Construction Timeline<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-retrofit-phases-timeline-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"293\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-retrofit-phases-timeline-1024x293.jpg\" alt=\"EHSL Construction Timeline\" class=\"wp-image-14284\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-retrofit-phases-timeline-1024x293.jpg 1024w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-retrofit-phases-timeline-300x86.jpg 300w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-retrofit-phases-timeline-768x219.jpg 768w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-retrofit-phases-timeline-1536x439.jpg 1536w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-retrofit-phases-timeline-2048x585.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/ehsl-retrofit-phases-timeline-scaled.jpg\">Click to view the full-size image of the project timeline<\/a><\/figcaption><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\">\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/you-will-love-the-changes-2023-2026.png\"><img loading=\"lazy\" decoding=\"async\" width=\"250\" height=\"400\" src=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/you-will-love-the-changes-2023-2026.png\" alt=\"You will love the changes. Safer, Quieter, More Comfortable\" class=\"wp-image-14211\" srcset=\"https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/you-will-love-the-changes-2023-2026.png 250w, https:\/\/library.med.utah.edu\/blog\/eccles\/files\/2023\/03\/you-will-love-the-changes-2023-2026-188x300.png 188w\" sizes=\"auto, (max-width: 250px) 100vw, 250px\" \/><\/a><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<h2 class=\"wp-block-heading\">What to Expect:<\/h2>\n\n\n\n<figure class=\"wp-block-table is-style-regular construction-phase has-medium-font-size\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\">2023<\/td><td class=\"has-text-align-center\" data-align=\"center\">APR<\/td><td><strong>PHASE 1<\/strong><br>Earthquake retrofitting, southeast corner of building.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">2023<\/td><td class=\"has-text-align-center\" data-align=\"center\">OCT<\/td><td><strong>PHASE 2<\/strong><br>Construction of the core, central elevator shaft.<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Spencer S. Eccles Library construction updates 2023-2026.<\/p>\n","protected":false},"author":156,"featured_media":14852,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-transformation.php","meta":{"_acf_changed":false,"footnotes":""},"coauthors":[9946],"class_list":["post-14080","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-05-12 12:55:18","action":"category","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/pages\/14080","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/users\/156"}],"replies":[{"embeddable":true,"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/comments?post=14080"}],"version-history":[{"count":252,"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/pages\/14080\/revisions"}],"predecessor-version":[{"id":17242,"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/pages\/14080\/revisions\/17242"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/media\/14852"}],"wp:attachment":[{"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/media?parent=14080"}],"wp:term":[{"taxonomy":"author","embeddable":true,"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/coauthors?post=14080"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}