{"id":1832,"date":"2012-04-06T09:45:01","date_gmt":"2012-04-06T15:45:01","guid":{"rendered":"http:\/\/library.med.utah.edu\/blog\/eccles\/?p=1832"},"modified":"2012-04-05T15:45:42","modified_gmt":"2012-04-05T21:45:42","slug":"remodeling-progress","status":"publish","type":"post","link":"https:\/\/library.med.utah.edu\/blog\/eccles\/2012\/04\/06\/remodeling-progress\/","title":{"rendered":"Remodeling progress"},"content":{"rendered":"<p>As we move through the spring semester, you can see construction &amp; remodeling progress on the upper and lower levels in this slideshow, from beginning through now (early April).<\/p>\n<p><object width=\"400\" height=\"300\"><param name=\"flashvars\" value=\"offsite=true&#038;lang=en-us&#038;page_show_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629131007677%2Fshow%2F&#038;page_show_back_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629131007677%2F&#038;set_id=72157629131007677&#038;jump_to=\"><\/param><param name=\"movie\" value=\"http:\/\/www.flickr.com\/apps\/slideshow\/show.swf?v=109615\"><\/param><param name=\"allowFullScreen\" value=\"true\"><\/param><embed type=\"application\/x-shockwave-flash\" src=\"http:\/\/www.flickr.com\/apps\/slideshow\/show.swf?v=109615\" allowFullScreen=\"true\" flashvars=\"offsite=true&#038;lang=en-us&#038;page_show_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629131007677%2Fshow%2F&#038;page_show_back_url=%2Fphotos%2Fehslibrary%2Fsets%2F72157629131007677%2F&#038;set_id=72157629131007677&#038;jump_to=\" width=\"400\" height=\"300\"><\/embed><\/object><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As we move through the spring semester, you can see construction &amp; remodeling progress on the upper and lower levels in this slideshow, from beginning through now (early April).<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[73],"tags":[779],"coauthors":[],"class_list":["post-1832","post","type-post","status-publish","format-standard","hentry","category-construction","tag-2nd-floor-remodel"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-04-19 22:15:14","action":"category","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/posts\/1832","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/comments?post=1832"}],"version-history":[{"count":6,"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/posts\/1832\/revisions"}],"predecessor-version":[{"id":1838,"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/posts\/1832\/revisions\/1838"}],"wp:attachment":[{"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/media?parent=1832"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/categories?post=1832"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/tags?post=1832"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/library.med.utah.edu\/blog\/eccles\/wp-json\/wp\/v2\/coauthors?post=1832"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}