July 28, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July 28, 2025

Construction ActivityMon
28
Tue
29
Wed
30
Thu
31
Fri
1
Rating
Drywall & Insulation (Comm & Lactation Rooms)444444 out of 10
Wood Wall Install Main Level666666 out of 10
Concrete Pours777777 out of 10
Rough MEP Connection Area7777 out of 10
Framing SOM Connection Area888 out of 10
Lower Level Demo Glass Between Existing Offices8888 out of 10
Anticipate level variances.

July 21, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July 21, 2025

Construction ActivityMon
21
Tue
22
Wed
23
Thu
24
Fri
25
Rating
Wood Walls666666 out of 10
Concrete Pours666666 out of 10
Rough MEP666666 out of 10
Drywall Install777777 out of 10
Anticipate level variances.

July 14, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July 14, 2025

Construction ActivityMon
14
Tue
15
Wed
16
Thu
17
Fri
18
Rating
Door Install444444 out of 10
Concrete Pours666666 out of 10
Wood Wall Install666666 out of 10
Rough MEP666666 out of 10
Framing777777 out of 10
Anticipate level variances.

July 7, 2025 | EHSL Construction update

Eccles Library Construction Update for July 7 - July 11

Eccles Health Library construction disturbance level for the week of July 7, 2025

Construction ActivityMon
7
Tue
8
Wed
9
Thu
10
Fri
11
Rating
Framing888888 out of 10
Rough MEP Comm rooms444444 out of 10
Anticipate level variances.

June 30, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June 30, 2025

Construction ActivityMon
30
Tue
1
Wed
2
Thu
3
Fri
4
Rating
Flooring Concrete444 out of 10
Framing88888 out of 10
Rough MEP Comm rooms444 out of 10
Anticipate level variances.

June 23, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June 23, 2025

Construction ActivityMon
23
Tue
24
Wed
25
Thu
26
Fri
27
Rating
Electrical Demo111111 out of 10
Bathroom Finishes333333 out of 10
Concrete Pour777777 out of 10
Framing Phase 2888888 out of 10
Anticipate level variances.

June 16, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June 16, 2025

Construction ActivityMon
16
Tue
17
Wed
18
Thu
19
Fri
20
Rating
Floor Concrete555555 out of 10
Framing777777 out of 10
Concrete Pours777 out of 10
Anticipate level variances.

June 9, 2025 | EHSL Construction update

Spencer S. Eccles Health Sciences Library Reopens June 8th, 7am. All services operational. Front desk staff returns to Library’s main floor location. In-person: Monday – Friday, 7am-6pm

June 9, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June 9, 2025

Construction ActivityMon
9
Tue
10
Wed
11
Thu
12
Fri
13
Rating
Punchlist Items444444 out of 10
Plumbing777777 out of 10
Steel Install888888 out of 10
Anticipate level variances.

May 19 to June 8, 2025 | Construction update

The Spencer S. Eccles Health Sciences Library will close for 3 weeks: May 19 – June 8 due to construction

Eccles Library Front Desk construction relocation May 19 to June 8th
Front Desk temporary construction relocation May 19th to June 8th

May 19, 2025 | Construction update

Eccles Library Construction Disturbance Level May 19-23, 2025
Eccles Library Construction Disturbance Level May 19-23, 2025.

May 12, 2025 | Construction update

Construction ActivityMon
19
Tue
20
Wed
21
Thu
22
Fri
23
Rating
Abatement Ph 2000000 out of 10
Punchlist00 out of 10
Plumbing0000 out of 10
Anticipate level variances.

EHSL Construction Disturbance level May 12-16

Eccles Health Library construction disturbance level for the week of May, 13, 2025

Construction ActivityMon
12
Tue
13
Wed
14
Thu
15
Fri
16
Rating
MEP Finishes4444 out of 10
Cleaning4444 out of 10
Wood Delivery 77 out of 10
Anticipate level variances.

May 5, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of May, 5, 2025

Construction ActivityMon
5
Tue
6
Wed
7
Thu
8
Fri
9
Rating
Hardware Install222 out of 10
Acoustical Ceiling Tiles333333 out of 10
Mirrors444 out of 10
MEP Finishes555555 out of 10
Delivery Level 1 Wood Slat Walls7777 out of 10
Anticipate level variances. Fumes possible on Thursday & Friday

April 29, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 29, 2025

Construction ActivityMon
28
Tue
29
Wed
30
Thu
1
Fri
2
Rating
Fan Room Start Up22 out of 10
MEP Finishes5555 out of 10
Door Installation555 out of 10
Anticipate level variances.

April 21, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 21, 2025

Construction ActivityMon
21
Tue
22
Wed
23
Thu
24
Fri
25
Rating
Paint in Bathrooms11 out of 10
Acoustical Ceiling Tiles3333 out of 10
MEP Finishes555555 out of 10
Fire Inspection555 out of 10
Anticipate level variances.

April 14, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 14, 2025

Construction ActivityMon
14
Tue
15
Wed
16
Thu
17
Fri
18
Rating
Paint in Bathrooms11111 out of 10
Doors Install33333 out of 10
Acoustical Ceiling Tiles555555 out of 10
Rebuild Fan Room777777 out of 10
Anticipate level variances.

April 7, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 7, 2025

Construction ActivityMon
7
Tue
8
Wed
9
Thu
10
Fri
11
Rating
Paint in Bathrooms3333 out of 10
Carpet Install444444 out of 10
Acoustical Ceiling777777 out of 10
Demo Fan Room9999 out of 10
Rebuild Fan Room99999 out of 10
Anticipate level variances.

EHSL is closed April 2, 2025 due to construction fumes in the building. No employees or patrons in the building.


March 31, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 31, 2025

Construction ActivityMon
31
Tue
1
Wed
2
Thu
3
Fri
4
Rating
Abatement of Fan Room2222 out of 10
MEP Finishes333333 out of 10
Acoustical Ceiling777 out of 10
HVAC Shutdown777777 out of 10
Anticipate level variances.

March 24, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 24, 2025

Construction ActivityMon
24
Tue
25
Wed
26
Thu
27
Fri
28
Rating
MDF Install777777 out of 10
Base at Elevator Entrances777777 out of 10
Steel Install at Stairs888888 out of 10
Anticipate level variances.

March 17, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 17, 2025

Construction ActivityMon
17
Tue
18
Wed
19
Thu
20
Fri
21
Rating
Abatement of Steel11111 out of 10
Tile777777 out of 10
MDF Install777777 out of 10
Base at Elevator Entrances777777 out of 10
Cable Tray Around Core888888 out of 10
Anticipate level variances.

March 10, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 10, 2025

Construction ActivityMon
10
Tue
11
Wed
12
Thu
13
Fri
14
Rating
Paint in Bathrooms11 out of 10
Toliet Partitions5555 out of 10
Drywall Around Core777777 out of 10
MDF Install777777 out of 10
Anticipate level variances.

March 3, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 3, 2025

Construction ActivityMon
3
Tue
4
Wed
5
Thu
6
Fri
7
Rating
Plumbing Finishes5555 out of 10
Finish Electrical555555 out of 10
Bathroom Tile777777 out of 10
Drywall Around Core888888 out of 10
Anticipate level variances.

February 24, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of February, 24, 2025

Construction ActivityMon
24
Tue
25
Wed
26
Thu
27
Fri
28
Rating
Paint Elevator Entrances2222 out of 10
Bathroom Tile777777 out of 10
Shelf Brackets77777 out of 10
Anticipate level variances.

February 17, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of February, 17, 2025

Construction ActivityMon
17
Tue
18
Wed
19
Thu
20
Fri
21
Rating
Taping & Mudding Entrances333 out of 10
Tile777777 out of 10
Demo Stairs1010 out of 10
Anticipate level variances.

February 10, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of February, 10, 2025

Construction ActivityMon
10
Tue
11
Wed
12
Thu
13
Fri
14
Rating
Mechanical Around Core222222 out of 10
Tile777777 out of 10
Demo Stairs101010101010 out of 10
Anticipate level variances.

February 3, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of February, 3, 2025

Construction ActivityMon
3
Tue
4
Wed
5
Thu
6
Fri
7
Rating
Mechanical Around Core222222 out of 10
Demo of Lower Level Study Rooms44444 out of 10
Drywall/Tile Backer Bathrooms555555 out of 10
Demo of Stairs88888 out of 10
Anticipate level variances.

January 27, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of January, 27, 2025

Construction ActivityMon
27
Tue
28
Wed
29
Thu
30
Fri
31
Rating
Firewall Caulk in Elevator4444 out of 10
Mechanical Around Core777 out of 10
Drywall/Tile Backer Bathrooms77777 out of 10
Drywall Elevator Fronts888 out of 10
Anticipate level variances.

January 20, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of January, 20, 2025

Construction ActivityMon
20
Tue
21
Wed
22
Thu
23
Fri
24
Rating
Elevator Phone Line444 out of 10
Fire Alarm555555 out of 10
Mechanical Elevator Entrances777 out of 10
Fire Sprinklers77777 out of 10
Anticipate level variances.

January 13, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of January, 13, 2025

Construction ActivityMon
13
Tue
14
Wed
15
Thu
16
Fri
17
Rating
Bathroom Work888888 out of 10
Smoke Doors-Fire Alarm888888 out of 10
Fire Sprinklers77 out of 10
Anticipate level variances.

December 30, 2024 | EHSL Construction update

Eccles Health Sciences Library closure for scheduled power outage is extended until 5PM, Dec 31, 2024.

Eccles Health Library construction disturbance level for the week of December, 30, 2024

Construction ActivityMon
30
Tue
31
Wed
1
Thu
2
Fri
3
Rating
Rough Electrical Bathroom8888 out of 10
Smoke Doors88 out of 10
Elevator8888 out of 10
Electrical Shutdown88 out of 10
Anticipate level variances.

December 23, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of December, 23, 2024

Construction ActivityMon
23
Tue
24
Wed
25
Thu
26
Fri
27
Rating
Rough Electrical Bathroom8888 out of 10
Rough Plumbing Bathroom88 out of 10
Smoke Doors8888 out of 10
Elevator8888 out of 10
4 Hour Electrical Shutdown55 out of 10
Anticipate level variances.

December 16, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of December, 16, 2024

Construction ActivityMon
16
Tue
17
Wed
18
Thu
19
Fri
20
Rating
Framing888888 out of 10
Bathroom Construction888888 out of 10
Smoke Doors88888 out of 10
Saw Cut Air Intake Wall1010 out of 10
Demo Electrical Room Walls101010 out of 10
Anticipate level variances.

December 9, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of December, 9, 2024

Construction ActivityMon
9
Tue
10
Wed
11
Thu
12
Fri
13
Rating
Elevator Install888888 out of 10
Bathroom Framing888888 out of 10
Anticipate level variances.

November 25, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of November, 25, 2024

Construction ActivityMon
25
Tue
26
Wed
27
Thu
28
Fri
29
Rating
Elevator Install888888 out of 10
Flooring Install888888 out of 10
Bathroom Framing888888 out of 10
Anticipate level variances.

November 18, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of November, 18, 2024

Construction ActivityMon
18
Tue
19
Wed
20
Thu
21
Fri
22
Rating
Rough Plumbing888 out of 10
Elevator Install888888 out of 10
Flooring Install8888 out of 10
Rough Carpentry8888 out of 10
Anticipate level variances.

November 11, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of November, 11, 2024

Construction ActivityMon
11
Tue
12
Wed
13
Thu
14
Fri
15
Rating
Elevator Install888888 out of 10
Flooring Install888888 out of 10
Rough Carpentry888888 out of 10
Anticipate level variances.

November 4, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of November, 4, 2024

Construction ActivityMon
4
Tue
5
Wed
6
Thu
7
Fri
8
Rating
Elevator Install888888 out of 10
Flooring Install8888 out of 10
Anticipate level variances.

October 28, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of October, 28, 2024

Construction ActivityMon
28
Tue
29
Wed
30
Thu
31
Fri
1
Rating
Rough Plumbing888888 out of 10
Elevator Install888888 out of 10
Flooring Install8888 out of 10
Rough Framing888 out of 10
Anticipate level variances.

October 21, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of October, 21, 2024

Construction ActivityMon
21
Tue
22
Wed
23
Thu
24
Fri
25
Rating
Rough Plumbing888888 out of 10
Elevator Install888888 out of 10
Anticipate level variances.

October 14, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of October, 14, 2024

Construction ActivityMon
14
Tue
15
Wed
16
Thu
17
Fri
18
Rating
Elevator Electrical Prep444 out of 10
Rough MEP888888 out of 10
Elevator Install88888 out of 10
Anticipate level variances.

October 7, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of October, 7, 2024

Construction ActivityMon
7
Tue
8
Wed
9
Thu
10
Fri
11
Rating
Roof Finish Work777777 out of 10
North Entrance-Steel8888 out of 10
Framing Upper Level8888 out of 10
MEP in Framed Walls888888 out of 10
Anticipate level variances.

September 30, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of September, 30, 2024

Construction ActivityMon
30
Tue
1
Wed
2
Thu
3
Fri
4
Rating
Elevator Safety Install/Electrical777777 out of 10
Roof Finish Work777777 out of 10
Steel Install888888 out of 10
Framing Upper Level888888 out of 10
Anticipate level variances.

September 23, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of September, 23, 2024

Construction ActivityMon
23
Tue
24
Wed
25
Thu
26
Fri
27
Rating
Framing Main Level77777 out of 10
Framing Upper Level77 out of 10
Pour Concrete Floor Upper Level88 out of 10
Seismic Steel101010101010 out of 10
Anticipate level variances.

September 16, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of September, 16, 2024

Construction ActivityMon
16
Tue
17
Wed
18
Thu
19
Fri
20
Rating
Framing Lower Level777777 out of 10
Form & Rebar Walls7777 out of 10
Concrete Pour Main Level10101010 out of 10
Anticipate level variances.

September 9, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of September, 9, 2024

Construction ActivityMon
9
Tue
10
Wed
11
Thu
12
Fri
13
Rating
Roof444444 out of 10
Form & Rebar Walls55 out of 10
Concrete Pour Main Level55 out of 10
Rough Mechanical & Plumbing555555 out of 10
Seismic Steel888888 out of 10
Anticipate level variances.

September 2, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of September, 2, 2024

Construction ActivityMon
2
Tue
3
Wed
4
Thu
5
Fri
6
Rating
Pipe Insulation444 out of 10
Form & Rebar South Shear Wall Both Floors55555 out of 10
Roof Curb & Walls77777 out of 10
Seismic Steel88888 out of 10
Anticipate level variances.

August 26, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of August, 26, 2024

Construction ActivityMon
26
Tue
27
Wed
28
Thu
29
Fri
30
Rating
Seismic Steel777777 out of 10
Form Walls Both Floors888888 out of 10
Pour Concrete1010101010 out of 10
Roof Install101010101010 out of 10
Anticipate level variances.

August 19, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of August, 19, 2024

Construction ActivityMon
19
Tue
20
Wed
21
Thu
22
Fri
23
Rating
Mechanical Upper Level77777 out of 10
Form & Rebar Shear Wall Both Floors888888 out of 10
Seismic Steel101010101010 out of 10
Roof Work101010101010 out of 10
Anticipate level variances.

August 12, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of August, 12, 2024

Construction ActivityMon
12
Tue
13
Wed
14
Thu
15
Fri
16
Rating
Mechanical Upper Level777777 out of 10
Form & Rebar Install Shotcrete Upper Level888888 out of 10
Roof Steel1010 out of 10
Seismic Steel101010101010 out of 10
Roof Work101010101010 out of 10
Anticipate level variances.

August 5, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of August, 5, 2024

Construction ActivityMon
5
Tue
6
Wed
7
Thu
8
Fri
9
Rating
Abatement444444 out of 10
Form & Rebar Install Shotcrete Upper Level666666 out of 10
Steel Install Across Hallways8888 out of 10
Roof Install101010101010 out of 10
Anticipate level variances.

July 29, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July, 29, 2024

Construction ActivityMon
29
Tue
30
Wed
31
Thu
1
Fri
2
Rating
Form & Rebar Shotcrete Upper Level555555 out of 10
Baseboard South Stair555555 out of 10
Mechanical Upper Level666666 out of 10
Roof Install101010101010 out of 10
Anticipate level variances.

July 22, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July, 22, 2024

Construction ActivityMon
22
Tue
23
Wed
24
Thu
25
Fri
26
Rating
Abatement222222 out of 10
Shotcrete Pour77 out of 10
Roof Work101010101010 out of 10
Anticipate level variances.

July 15, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July, 15, 2024

Construction ActivityMon
15
Tue
16
Wed
17
Thu
18
Fri
19
Rating
Gypsum Board666666 out of 10
Roof Phase 1101010 out of 10
Roof Phase 2101010101010 out of 10
Roof Phase 3101010 out of 10
Anticipate level variances.

July 8, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July, 8, 2024

Construction ActivityMon
8
Tue
9
Wed
10
Thu
11
Fri
12
Rating
Rough MEP South Stair555555 out of 10
Roof Phase 199999 out of 10
Roof Phase 29999 out of 10
Anticipate level variances.

July 1, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July, 1, 2024

Construction ActivityMon
1
Tue
2
Wed
3
Thu
4
Fri
5
Rating
Demo/Rough Electrical
Rough HVAC
55555 out of 10
Form & Rebar Install Shortcrete Main Level7777 out of 10
Framing South Stair7777 out of 10
Anticipate level variances.

June 24, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June, 24, 2024

Construction ActivityMon
24
Tue
25
Wed
26
Thu
27
Fri
28
Rating
Rebar for Shear Wall Main Level55 out of 10
Steel Install South Stair777 out of 10
Framing South Stair7777 out of 10
Anticipate level variances.

June 17, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June, 17, 2024

Construction ActivityMon
17
Tue
18
Wed
19
Thu
20
Fri
21
Rating
Demo & Rough Electrical555555 out of 10
Demo/Rough HVAC for Exhaust Fans555555 out of 10
South Stair Rebar & Shotcrete888 out of 10
Install Steel Main Floor888888 out of 10
Anticipate level variances.

June 10, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June, 10, 2024

Construction ActivityMon
10
Tue
11
Wed
12
Thu
13
Fri
14
Rating
Demo & Rough Electrical555555 out of 10
Demo/Rough HVAC for Exhaust Fans555555 out of 10
Form & Rebar for Shotcrete Lower Level555 out of 10
South Stair Rebar & Shotcrete6666 out of 10
Install Steel Main Level8888 out of 10
Anticipate level variances.

June 3, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June, 3, 2024

Construction ActivityMon
3
Tue
4
Wed
5
Thu
6
Fri
7
Rating
Demo & Rough Electrical555555 out of 10
Demo/Rough HVAC for Exhaust Fans555555 out of 10
Form & Rebar for Shotcrete Lower Level555555 out of 10
South Stair Rebar & Shotcrete666666 out of 10
Anticipate level variances.

May 27, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of May, 27, 2024

Construction ActivityMon
27
Tue
28
Wed
29
Thu
30
Fri
31
Rating
Form & Rebar Work Shotcrete Walls Lower Level777777 out of 10
South Wall Shotcrete/All Thread888888 out of 10
Anticipate level variances.

May 13, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of May, 13, 2024

Construction ActivityMon
13
Tue
14
Wed
15
Thu
16
Fri
17
Rating
Relief Fans555555 out of 10
Roof Phase 1777777 out of 10
Structural Steel888888 out of 10
Demo/Shoring South Stair101010101010 out of 10
Anticipate level variances.

May 6, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of May, 6, 2024

Construction ActivityMon
29
Tue
30
Wed
1
Thu
2
Fri
3
Rating
Abatement222222 out of 10
Underground Plumbing333333 out of 10
Relief Fans555555 out of 10
Roof Phase 1777777 out of 10
Structural Steel888888 out of 10
Anticipate level variances.

April 29, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 29, 2024

Construction ActivityMon
29
Tue
30
Wed
1
Thu
2
Fri
3
Rating
Abatement222222 out of 10
Waterproofing333 out of 10
Start up for Relief Fans333333 out of 10
Form/Rebar for Mat Flooring555555 out of 10
Excavation77 out of 10
Anticipate level variances.

April 22, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 22, 2024

Construction ActivityMon
22
Tue
23
Wed
24
Thu
25
Fri
26
Rating
Waterproofing & Underground Plumbing333333 out of 10
Abatement555555 out of 10
Demo/Rough HVAC for Exhaust Fans666666 out of 10
Excavation777 out of 10
Anticipate level variances.

April 15, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 15, 2024

Construction ActivityMon
15
Tue
16
Wed
17
Thu
18
Fri
19
Rating
Controls for Relief Fans33333 out of 10
Duct Work for Exhaust Fans666 out of 10
Demo/Rough HVAC for Exhaust Fans666666 out of 10
Excavation777777 out of 10
Anticipate level variances.

April 8, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 8, 2024

Construction ActivityMon
8
Tue
9
Wed
10
Thu
11
Fri
12
Rating
Demo/Rough HVAC for Exhaust Fans666666 out of 10
Excavation777777 out of 10
Anticipate level variances.

April 1, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 1, 2024

Construction ActivityMon
1
Tue
2
Wed
3
Thu
4
Fri
5
Rating
Demo/Rough HVAC for Exhaust Fans666666 out of 10
Lower Level Closed666666 out of 10
Excavation777777 out of 10
Anticipate level variances.

March 25, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 25, 2024

Construction ActivityMon
25
Tue
26
Wed
27
Thu
28
Fri
29
Rating
Move roof relief air fans555555 out of 10
Excavation666666 out of 10
Demo footings1010 out of 10
Anticipate level variances.

March 18, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 18, 2024

Construction ActivityMon
18
Tue
19
Wed
20
Thu
21
Fri
22
Rating
Demo main floor steel6666 out of 10
Demo concrete on lower level10101010 out of 10
Anticipate level variances.

March 11, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 11, 2024

Construction ActivityMon
11
Tue
12
Wed
13
Thu
14
Fri
15
Rating
Demo main floor steel6666 out of 10
Steel for exhaust fans8888 out of 10
Demo main floor concrete10101010 out of 10
Anticipate level variances.

March 4, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 4, 2024

Construction ActivityMon
4
Tue
5
Wed
6
Thu
7
Fri
8
Rating
Fire Sprinklers55 out of 10
Steel for exhaust fans666 out of 10
Demo Upper Floor Steel101010 out of 10
Demo Main Floor Concrete1010101010 out of 10
Anticipate level variances.

February 26, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of Feb, 26, 2024

Construction ActivityMon
26
Tue
27
Wed
28
Thu
29
Fri
1
Rating
Electrical Demo/Rough Electrical555555 out of 10
Demo/Rough HVAC for exhaust fans555555 out of 10
Rough Plumbing666666 out of 10
Demo Upper Floor101010101010 out of 10
Anticipate level variances.

February 19, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of Feb, 19, 2024

Construction ActivityMon
19
Tue
20
Wed
21
Thu
22
Fri
23
Rating
Electrical Demo/Rough Electrical555555 out of 10
Demo/Rough HVAC for exhaust fans555555 out of 10
Rough Plumbing666666 out of 10
Steel for exhaust fans1010101010 out of 10
Anticipate level variances.

Eccles Health Sciences Library will be having a wifi outage on Monday February 19, 2024 from 6AM to about 8:30AM.


February 12, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of Feb, 12, 2024

Construction ActivityMon
12
Tue
13
Wed
14
Thu
15
Fri
16
Rating
Rough Plumbing555555 out of 10
Electrical Demo/Rough Electrical666666 out of 10
Demo/Rough HVAC for exhaust fans888888 out of 10
Steel Install upper core/main floor
Steel for exhaust fans
101010101010 out of 10
Anticipate level variances.

February 5, 2024 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Feb, 5, 2024

Construction ActivityMon
5
Tue
6
Wed
7
Thu
8
Fri
9
Rating
Steel Abatement 22222 out of 10
Rough Plumbing55555 out of 10
Electrical Demo/Rough Electrical66666 out of 10
Steel Install around core1010101010 out of 10
Anticipate level variances.

January 29, 2024 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Jan, 29, 2024

Construction ActivityMon
29
Tue
30
Wed
31
Thu
1
Fri
2
Rating
Steel Abatement 222222 out of 10
UIT Relocation333333 out of 10
Rough Plumbing555555 out of 10
Steel Install around core
Electrical Demo/Rough Electrical
666666 out of 10
Anticipate level variances.

January 22, 2024 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Jan, 22, 2024

Construction ActivityMon
22
Tue
23
Wed
24
Thu
25
Fri
26
Rating
Steel Abatement 222222 out of 10
UIT Relocation333333 out of 10
Mechanical Demo/Rerouting
Rough Plumbing
555555 out of 10
Anticipate level variances.

January 15, 2024 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Jan, 15, 2024

Construction ActivityMon
15
Tue
16
Wed
17
Thu
18
Fri
19
Rating
Steel Abatement around core
Electrical Demo/Rough Electrical
555555 out of 10
Mechanical Demo/Rerouting
Rough Plumbing
666666 out of 10
Demo concrete columns/walls
Core Drilling for UIT
10101010 out of 10
Micropiles in basement101010101010 out of 10
Anticipate level variances.

January 8, 2024 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Jan, 8, 2024

Construction ActivityMon
8
Tue
9
Wed
10
Thu
11
Fri
12
Rating
UIT Relocation333333 out of 10
Rough Plumbing/Electrical Demo555555 out of 10
Drywall & Steel Abatement 555555 out of 10
Demo South Stair101010101010 out of 10
Anticipate level variances.

January 1, 2024 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Jan, 1, 2024

Construction ActivityMon
1
Tue
2
Wed
3
Thu
4
Fri
5
Rating
UIT Relocation33333 out of 10
Rough Plumbing/Electrical Demo4 4444 out of 10
Drywall Abatement & Mechanical Demo/Rerouting55555 out of 10
Demolition of Concrete & Walls1010101010 out of 10
Anticipate level variances.

December 25, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Dec, 25, 2023

Construction ActivityMon
25
Tue
26
Wed
27
Thu
28
Fri
29
Rating
UIT Relocation33333 out of 10
Rough Plumbing/Electrical Demo4 4444 out of 10
Drywall Abatement & Mechanical Demo/Rerouting55555 out of 10
Demolition of Concrete & Walls1010101010 out of 10
Anticipate level variances.

December 18, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Dec, 18, 2023

Construction ActivityMon
11
Tue
12
Wed
13
Thu
14
Fri
15
Rating
Drywall Abatement555555 out of 10
Mechanical Demo/Rerouting55 5555 out of 10
Rough Plumbing555555 out of 10
Electrical Demo555555 out of 10
Anticipate level variances.

December 13, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Dec, 13, 2023

Construction ActivityMon
11
Tue
12
Wed
13
Thu
14
Fri
15
Rating
Drywall Abatement555555 out of 10
Demo Salvaged Store Front 5555 out of 10
Mechanical Demo55555 out of 10
Rough Plumbing & Electrical Demo555555 out of 10
Anticipate level variances.

December 4, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Dec, 4, 2023

Construction ActivityMon
4
Tue
5
Wed
6
Thu
7
Fri
8
Rating
Set up temp walls/demo salvaged items333333 out of 10
UIT Relocation33 3333 out of 10
MEP Demo/Evaluation & Fire Sprinkler relocation555555 out of 10
Drywall Abatement555555 out of 10
Anticipate level variances.

November 27, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Nov, 27, 2023

Construction ActivityMon
27
Tue
28
Wed
29
Thu
30
Fri
1
Rating
Phase 2 Mob11 out of 10
Phase 2 Temp Walls1 1111 out of 10
Phase 2 Selective Demo/Salvaged Items22 out of 10
Anticipate level variances.

November 20, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Nov, 20, 2023

Construction ActivityMon
20
Tue
21
Wed
22
Thu
23
Fri
24
Rating
Taking Down Phase 1 Panels11 out of 10
Punch List/Cleaning11 11 out of 10
Anticipate level variances.

November 13, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Nov, 13, 2023

Construction ActivityMon
13
Tue
14
Wed
15
Thu
16
Fri
17
Rating
Finish Electrical111111 out of 10
Acoustical Ceiling Grid/Tiles333 out of 10
Anticipate level variances.

November 6, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Nov, 6, 2023

Construction ActivityMon
6
Tue
7
Wed
8
Thu
9
Fri
10
Rating
Reinstall wood panels444444 out of 10
Anticipate level variances.

October 30, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Oct, 30, 2023

Construction ActivityMon
30
Tue
31
Wed
1
Thu
2
Fri
3
Rating
Reinstall wood panels555555 out of 10
Anticipate level variances.

October 23, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Oct, 23, 2023

Construction ActivityMon
23
Tue
24
Wed
25
Thu
26
Fri
27
Rating
Reinstall wood panels444444 out of 10
Anticipate level variances.

October 16, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Oct, 16, 2023

Construction ActivityMon
16
Tue
17
Wed
18
Thu
19
Fri
20
Rating
Framing666 out of 10
Reroof444 out of 10
Installing gyp board
(constant drilling)
444444 out of 10
Anticipate level variances.

October 9, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Oct, 9, 2023

Construction ActivityMon
9
Tue
10
Wed
11
Thu
12
Fri
13
Rating
Insulation33333 out of 10
Rough Electrical333333 out of 10
Reroof44444 out of 10
Anticipate level variances.

September 25, 2023 | EHSL Construction update

Eccles Library Construction Disturbance Level for Week 39, 2023
Eccles Library Construction Disturbance Level for Week 39, 2023

Construction ActivityMon
18
Tue
19
Wed
20
Thu
21
Fri
22
Rating
Structural Steel at Roof
*Use of “puncture gun” sound can resemble gunshots
888 out of 10
Shotcrete Rebar Drilling88888 out of 10
SewerTBDTBDTBDTBD
Anticipate level variances.

September 18, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Sept, 18, 2023

Construction ActivityMon
18
Tue
19
Wed
20
Thu
21
Fri
22
Rating
Structural Steel Welding
*Potential fumes
666666 out of 10
Structural Steel Roof
*Use of “puncture gun”, sound can resemble gunshots
888888 out of 10
Structural Steel Bent Plate
(Drilling)
888888 out of 10
Shotcrete Rebar Drilling888888 out of 10
Anticipate level variances.

The next phase of the seismic retrofit will be attaching the steel plates to the roof. This involves the use of a ‘puncture gun’ which can sometimes resemble the sound of gunshots. This will take place in EHSL from Friday September 15 through the 22.


Structural steel welding could cause possible fumes inside EHSL from September 11 – 15, 2023


September 11, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Sept, 11, 2023

Construction ActivityMon
11
Tue
12
Wed
13
Thu
14
Fri
15
Rating
Steel Plates444444 out of 10
Structural Steel Roof
*Use of “puncture gun”, sound can resemble gunshots
77777 out of 10
Structural Steel Welding
*Potential fumes
666666 out of 10
Anticipate level variances.

September 4, 2023 | EHSL Construction update

EHSL Construction Disturbance

Eccles Sciences Health Library construction disturbance level for the week of Sept, 4, 2023

Construction ActivityMon
4
Tue
5
Wed
6
Thu
7
Fri
8
Rating
Steel Install777777 out of 10
Drilling for rebar8888 out of 10
Structural Steel Welding
*Potential fumes
66 out of 10
Anticipate level variances.

August 28, 2023 | EHSL Construction update

EHSL Construction Disturbance

Eccles Sciences Health Library construction disturbance level for the week of Aug, 28, 2023

Construction ActivityMon
28
Tue
29
Wed
30
Thu
31
Fri
1
Rating
Steel Layout/drilling6666 out of 10
Steel Install 777 out of 10
Sewer Install866666 out of 10
Anticipate level variances.

August 21, 2023 | EHSL Construction update

Steel beam fabrication is complete so they will begin installing in the southeast corner of the Main Level on Monday August 21, 2023 and will last all week. This will be disruptive as they will be drilling holes in the concrete to install. There are noise cancelling headphones available at the front desk.



August 21, 2023 | Eccles School of Medicine construction disturbance level for the week.

Eccles School of Medicine construction disturbance level for the week of Aug, 21, 2023
Eccles School of Medicine construction disturbance level for the week of Aug, 21, 2023
Construction ActivityMon
21
Tue
22
Wed
23
Thu
24
Fri
25
Rating
HP Pile Shoring & Shotcrete Work555555 out of 10
Concrete Footings & Foundations333333 out of 10
Demolish College of Nursing Parking Garage88 out of 10
Anticipate level variances.

August 14, 2023 | Eccles School of Medicine construction disturbance level for the week.

Eccles School of Medicine construction disturbance level for the week of Aug, 14, 2023
Eccles School of Medicine construction disturbance level for the week of Aug, 14, 2023
Construction ActivityMon
14
Tue
15
Wed
16
Thu
17
Fri
18
Rating
HP Pile Shoring & Shotcrete Work555555 out of 10
Concrete Footings & Foundations333333 out of 10
Anticipate level variances.

August 7, 2023 | Eccles School of Medicine construction disturbance level for the week.

Eccles School of Medicine construction disturbance level for the week of Aug, 7, 2023
Eccles School of Medicine construction disturbance level for the week of Aug, 7, 2023
Construction ActivityMon
7
Tue
8
Wed
9
Thu
10
Fri
11
Rating
Shotcrete and Soil Noils of EHSL Mechanical Room555555 out of 10
HP Pile Shoring Work555555 out of 10
Anticipate level variances.

July 29, 2023 | EHSL closed during planned power outage Saturday, July 29 from 6 AM to 10 AM.

IMPACTS:

  • No after-hours badge access in EHSL
  • Study rooms available at EHSEB during this time period
  • Turn off any connected devices requiring power
  • Off-campus website access normal operations
July 29, 2023, EHSL closure from 6 am to 10 am for planned power outtage

June 9-12, 2023 | EHSL closed during planned power outage from Friday, 3 PM, June 9, until Monday, 7 AM, June 12.

IMPACTS:

  • No after-hours badge access in EHSL. Please use EHSEB during this time period
  • Turn off any connected devices requiring power
  • Off-campus website access normal operations
Retrofit Updates June 10, 2023. EHSL closed from June 9, at 3 PM until June 12, 7 AM for a power outage.

June 5, 2023 | Retrofit construction begins, south east corner, main and upper level.

IMPACTS:

  • Construction noise
  • North, South and EHSEB bridge entries all accessible

May 24, 2023 | Level A access to School of Medicine (SOM) closes. Concrete removal scheduled to start.

IMPACTS:

  • Level 1 south east door opens with badge access
  • Potential concrete removal begins anticipate high-level noise, ground vibrations and disruptive working environments
  • North, South and EHSEB bridge entries all accessible
Level A access to School of Medicine (SOM) closes. Concrete removal scheduled to start.

May 23, 2023 | North and South doors of EHSL replaced, main entrance closes

IMPACTS:

  • North and South doors inaccessible
  • Main entrance closes for duration of SOM construction
  • EHSEB bridge entry remains open
EHSL North and South doors replaced. Access by EHSEB bridge upper level.

May 23, 2023 | EHSL main and north entrance closed no card entrance. Access through the EHSEB bridge. Reopening TBA.

Due to a new doors and card reader installation at the new south entrance location.


May 22, 2023 | School of Medicine (SOM): West sidewalk closes

IMPACTS:

  • Access to Main level entrance closed for duration of SOM construction
  • EHSL access restricted to EHSEB bridge and North doors
Spencer Fox Eccles School of Medicine west side walk closes, May 22, 2023

Past Updates

May 11, 2023 | Phase 1: South bike racks removal

May 8, 2023 | Phase 1: Furniture removal from the southeast corner on the main level.


April 17, 2023 | Spencer Fox Eccles School of Medicine construction perimeter fence installation.

View the construction map for impacted areas.

Spencer Fox Eccles School of Medicine construction perimeter fence installation.
Click to view the full-size image of the impacted areas.

Traffic Impacts

Spencer Fox Eccles School of Medicine construction perimeter fence traffic impact
Click to view the full-size image of the traffic impact.

To see the most current information https://map.utah.edu/


March 16, 2023 | We have exciting news for 2023: EHSL is preparing for an earthquake retrofit! We anticipate construction changes and updates over the next three years. Stay up to date on all the details at the construction website.

View Seismic Construction Timeline

EHSL Construction Timeline
Click to view the full-size image of the project timeline

You will love the changes. Safer, Quieter, More Comfortable

What to Expect:

2023APRPHASE 1
Earthquake retrofitting, southeast corner of building.
2023OCTPHASE 2
Construction of the core, central elevator shaft.