July 28, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July 28, 2025
Construction Activity | Mon 28 | Tue 29 | Wed 30 | Thu 31 | Fri 1 | Rating |
---|---|---|---|---|---|---|
Drywall & Insulation (Comm & Lactation Rooms) | 4 | 4 | 4 | 4 | 4 | 4 out of 10 |
Wood Wall Install Main Level | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Concrete Pours | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Rough MEP Connection Area | 7 | 7 | 7 | 7 out of 10 | ||
Framing SOM Connection Area | 8 | 8 | 8 out of 10 | |||
Lower Level Demo Glass Between Existing Offices | 8 | 8 | 8 | 8 out of 10 |
July 21, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July 21, 2025
Construction Activity | Mon 21 | Tue 22 | Wed 23 | Thu 24 | Fri 25 | Rating |
---|---|---|---|---|---|---|
Wood Walls | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Concrete Pours | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Rough MEP | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Drywall Install | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
July 14, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July 14, 2025
Construction Activity | Mon 14 | Tue 15 | Wed 16 | Thu 17 | Fri 18 | Rating |
---|---|---|---|---|---|---|
Door Install | 4 | 4 | 4 | 4 | 4 | 4 out of 10 |
Concrete Pours | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Wood Wall Install | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Rough MEP | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Framing | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
July 7, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July 7, 2025
Construction Activity | Mon 7 | Tue 8 | Wed 9 | Thu 10 | Fri 11 | Rating |
---|---|---|---|---|---|---|
Framing | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Rough MEP Comm rooms | 4 | 4 | 4 | 4 | 4 | 4 out of 10 |
June 30, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June 30, 2025
Construction Activity | Mon 30 | Tue 1 | Wed 2 | Thu 3 | Fri 4 | Rating |
---|---|---|---|---|---|---|
Flooring Concrete | 4 | 4 | 4 out of 10 | |||
Framing | 8 | 8 | 8 | 8 | 8 out of 10 | |
Rough MEP Comm rooms | 4 | 4 | 4 out of 10 | |||
June 23, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June 23, 2025
Construction Activity | Mon 23 | Tue 24 | Wed 25 | Thu 26 | Fri 27 | Rating |
---|---|---|---|---|---|---|
Electrical Demo | 1 | 1 | 1 | 1 | 1 | 1 out of 10 |
Bathroom Finishes | 3 | 3 | 3 | 3 | 3 | 3 out of 10 |
Concrete Pour | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Framing Phase 2 | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
June 16, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June 16, 2025
Construction Activity | Mon 16 | Tue 17 | Wed 18 | Thu 19 | Fri 20 | Rating |
---|---|---|---|---|---|---|
Floor Concrete | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Framing | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Concrete Pours | 7 | 7 | 7 out of 10 |
June 9, 2025 | EHSL Construction update
Spencer S. Eccles Health Sciences Library Reopens June 8th, 7am. All services operational. Front desk staff returns to Library’s main floor location. In-person: Monday – Friday, 7am-6pm
June 9, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June 9, 2025
Construction Activity | Mon 9 | Tue 10 | Wed 11 | Thu 12 | Fri 13 | Rating |
---|---|---|---|---|---|---|
Punchlist Items | 4 | 4 | 4 | 4 | 4 | 4 out of 10 |
Plumbing | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Steel Install | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
May 19 to June 8, 2025 | Construction update
The Spencer S. Eccles Health Sciences Library will close for 3 weeks: May 19 – June 8 due to construction
- The library’s front desk staff will temporarily be relocated in Eccles Health Sciences Education Building (EHSEB) 3100, Computer Suite and available M-F, 7am-6pm.
- If you have questions, please contact Eccles Library staff by clicking here, calling 801-581-5534 or live chat https://library.med.utah.edu/ask/
- FOR URGENT BUILDING REQUESTS CONTACT 801-581-7221 (24hr)
- EHSEB is open regular hours with 24/7 badge access. Security will be present.
- EHSEB study rooms https://ehseb.utah.edu/spaces/study-rooms/
- EHSEB computer suite https://ehseb.utah.edu/spaces/computer-suite/

May 19, 2025 | Construction update

May 12, 2025 | Construction update
Construction Activity | Mon 19 | Tue 20 | Wed 21 | Thu 22 | Fri 23 | Rating |
---|---|---|---|---|---|---|
Abatement Ph 2 | 0 | 0 | 0 | 0 | 0 | 0 out of 10 |
Punchlist | 0 | 0 out of 10 | ||||
Plumbing | 0 | 0 | 0 | 0 out of 10 | ||

Eccles Health Library construction disturbance level for the week of May, 13, 2025
Construction Activity | Mon 12 | Tue 13 | Wed 14 | Thu 15 | Fri 16 | Rating |
---|---|---|---|---|---|---|
MEP Finishes | 4 | 4 | 4 | 4 out of 10 | ||
Cleaning | 4 | 4 | 4 | 4 out of 10 | ||
Wood Delivery | 7 | 7 out of 10 | ||||
May 5, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of May, 5, 2025
Construction Activity | Mon 5 | Tue 6 | Wed 7 | Thu 8 | Fri 9 | Rating |
---|---|---|---|---|---|---|
Hardware Install | 2 | 2 | 2 out of 10 | |||
Acoustical Ceiling Tiles | 3 | 3 | 3 | 3 | 3 | 3 out of 10 |
Mirrors | 4 | 4 | 4 out of 10 | |||
MEP Finishes | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Delivery Level 1 Wood Slat Walls | 7 | 7 | 7 | 7 out of 10 |
April 29, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 29, 2025
Construction Activity | Mon 28 | Tue 29 | Wed 30 | Thu 1 | Fri 2 | Rating |
---|---|---|---|---|---|---|
Fan Room Start Up | 2 | 2 out of 10 | ||||
MEP Finishes | 5 | 5 | 5 | 5 out of 10 | ||
Door Installation | 5 | 5 | 5 out of 10 |
April 21, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 21, 2025
Construction Activity | Mon 21 | Tue 22 | Wed 23 | Thu 24 | Fri 25 | Rating |
---|---|---|---|---|---|---|
Paint in Bathrooms | 1 | 1 out of 10 | ||||
Acoustical Ceiling Tiles | 3 | 3 | 3 | 3 out of 10 | ||
MEP Finishes | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Fire Inspection | 5 | 5 | 5 out of 10 |
April 14, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 14, 2025
Construction Activity | Mon 14 | Tue 15 | Wed 16 | Thu 17 | Fri 18 | Rating |
---|---|---|---|---|---|---|
Paint in Bathrooms | 1 | 1 | 1 | 1 | 1 out of 10 | |
Doors Install | 3 | 3 | 3 | 3 | 3 out of 10 | |
Acoustical Ceiling Tiles | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Rebuild Fan Room | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
April 7, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 7, 2025
Construction Activity | Mon 7 | Tue 8 | Wed 9 | Thu 10 | Fri 11 | Rating |
---|---|---|---|---|---|---|
Paint in Bathrooms | 3 | 3 | 3 | 3 out of 10 | ||
Carpet Install | 4 | 4 | 4 | 4 | 4 | 4 out of 10 |
Acoustical Ceiling | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Demo Fan Room | 9 | 9 | 9 | 9 out of 10 | ||
Rebuild Fan Room | 9 | 9 | 9 | 9 | 9 out of 10 |
EHSL is closed April 2, 2025 due to construction fumes in the building. No employees or patrons in the building.
March 31, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 31, 2025
Construction Activity | Mon 31 | Tue 1 | Wed 2 | Thu 3 | Fri 4 | Rating |
---|---|---|---|---|---|---|
Abatement of Fan Room | 2 | 2 | 2 | 2 out of 10 | ||
MEP Finishes | 3 | 3 | 3 | 3 | 3 | 3 out of 10 |
Acoustical Ceiling | 7 | 7 | 7 out of 10 | |||
HVAC Shutdown | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
March 24, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 24, 2025
Construction Activity | Mon 24 | Tue 25 | Wed 26 | Thu 27 | Fri 28 | Rating |
---|---|---|---|---|---|---|
MDF Install | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Base at Elevator Entrances | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Steel Install at Stairs | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
March 17, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 17, 2025
Construction Activity | Mon 17 | Tue 18 | Wed 19 | Thu 20 | Fri 21 | Rating |
---|---|---|---|---|---|---|
Abatement of Steel | 1 | 1 | 1 | 1 | 1 out of 10 | |
Tile | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
MDF Install | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Base at Elevator Entrances | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Cable Tray Around Core | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
March 10, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 10, 2025
Construction Activity | Mon 10 | Tue 11 | Wed 12 | Thu 13 | Fri 14 | Rating |
---|---|---|---|---|---|---|
Paint in Bathrooms | 1 | 1 out of 10 | ||||
Toliet Partitions | 5 | 5 | 5 | 5 out of 10 | ||
Drywall Around Core | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
MDF Install | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
March 3, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 3, 2025
Construction Activity | Mon 3 | Tue 4 | Wed 5 | Thu 6 | Fri 7 | Rating |
---|---|---|---|---|---|---|
Plumbing Finishes | 5 | 5 | 5 | 5 out of 10 | ||
Finish Electrical | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Bathroom Tile | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Drywall Around Core | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
February 24, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of February, 24, 2025
Construction Activity | Mon 24 | Tue 25 | Wed 26 | Thu 27 | Fri 28 | Rating |
---|---|---|---|---|---|---|
Paint Elevator Entrances | 2 | 2 | 2 | 2 out of 10 | ||
Bathroom Tile | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Shelf Brackets | 7 | 7 | 7 | 7 | 7 out of 10 |
February 17, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of February, 17, 2025
Construction Activity | Mon 17 | Tue 18 | Wed 19 | Thu 20 | Fri 21 | Rating |
---|---|---|---|---|---|---|
Taping & Mudding Entrances | 3 | 3 | 3 out of 10 | |||
Tile | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Demo Stairs | 10 | 10 out of 10 |
February 10, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of February, 10, 2025
Construction Activity | Mon 10 | Tue 11 | Wed 12 | Thu 13 | Fri 14 | Rating |
---|---|---|---|---|---|---|
Mechanical Around Core | 2 | 2 | 2 | 2 | 2 | 2 out of 10 |
Tile | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Demo Stairs | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
February 3, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of February, 3, 2025
Construction Activity | Mon 3 | Tue 4 | Wed 5 | Thu 6 | Fri 7 | Rating |
---|---|---|---|---|---|---|
Mechanical Around Core | 2 | 2 | 2 | 2 | 2 | 2 out of 10 |
Demo of Lower Level Study Rooms | 4 | 4 | 4 | 4 | 4 out of 10 | |
Drywall/Tile Backer Bathrooms | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Demo of Stairs | 8 | 8 | 8 | 8 | 8 out of 10 |
January 27, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of January, 27, 2025
Construction Activity | Mon 27 | Tue 28 | Wed 29 | Thu 30 | Fri 31 | Rating |
---|---|---|---|---|---|---|
Firewall Caulk in Elevator | 4 | 4 | 4 | 4 out of 10 | ||
Mechanical Around Core | 7 | 7 | 7 out of 10 | |||
Drywall/Tile Backer Bathrooms | 7 | 7 | 7 | 7 | 7 out of 10 | |
Drywall Elevator Fronts | 8 | 8 | 8 out of 10 |
January 20, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of January, 20, 2025
Construction Activity | Mon 20 | Tue 21 | Wed 22 | Thu 23 | Fri 24 | Rating |
---|---|---|---|---|---|---|
Elevator Phone Line | 4 | 4 | 4 out of 10 | |||
Fire Alarm | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Mechanical Elevator Entrances | 7 | 7 | 7 out of 10 | |||
Fire Sprinklers | 7 | 7 | 7 | 7 | 7 out of 10 |
January 13, 2025 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of January, 13, 2025
Construction Activity | Mon 13 | Tue 14 | Wed 15 | Thu 16 | Fri 17 | Rating |
---|---|---|---|---|---|---|
Bathroom Work | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Smoke Doors-Fire Alarm | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Fire Sprinklers | 7 | 7 out of 10 |
December 30, 2024 | EHSL Construction update
Eccles Health Sciences Library closure for scheduled power outage is extended until 5PM, Dec 31, 2024.

Eccles Health Library construction disturbance level for the week of December, 30, 2024
Construction Activity | Mon 30 | Tue 31 | Wed 1 | Thu 2 | Fri 3 | Rating |
---|---|---|---|---|---|---|
Rough Electrical Bathroom | 8 | 8 | 8 | 8 out of 10 | ||
Smoke Doors | 8 | 8 out of 10 | ||||
Elevator | 8 | 8 | 8 | 8 out of 10 | ||
Electrical Shutdown | 8 | 8 out of 10 |
December 23, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of December, 23, 2024
Construction Activity | Mon 23 | Tue 24 | Wed 25 | Thu 26 | Fri 27 | Rating |
---|---|---|---|---|---|---|
Rough Electrical Bathroom | 8 | 8 | 8 | 8 out of 10 | ||
Rough Plumbing Bathroom | 8 | 8 out of 10 | ||||
Smoke Doors | 8 | 8 | 8 | 8 out of 10 | ||
Elevator | 8 | 8 | 8 | 8 out of 10 | ||
4 Hour Electrical Shutdown | 5 | 5 out of 10 |
December 16, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of December, 16, 2024
Construction Activity | Mon 16 | Tue 17 | Wed 18 | Thu 19 | Fri 20 | Rating |
---|---|---|---|---|---|---|
Framing | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Bathroom Construction | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Smoke Doors | 8 | 8 | 8 | 8 | 8 out of 10 | |
Saw Cut Air Intake Wall | 10 | 10 out of 10 | ||||
Demo Electrical Room Walls | 10 | 10 | 10 out of 10 |
December 9, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of December, 9, 2024
Construction Activity | Mon 9 | Tue 10 | Wed 11 | Thu 12 | Fri 13 | Rating |
---|---|---|---|---|---|---|
Elevator Install | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Bathroom Framing | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
November 25, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of November, 25, 2024
Construction Activity | Mon 25 | Tue 26 | Wed 27 | Thu 28 | Fri 29 | Rating |
---|---|---|---|---|---|---|
Elevator Install | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Flooring Install | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Bathroom Framing | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
November 18, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of November, 18, 2024
Construction Activity | Mon 18 | Tue 19 | Wed 20 | Thu 21 | Fri 22 | Rating |
---|---|---|---|---|---|---|
Rough Plumbing | 8 | 8 | 8 out of 10 | |||
Elevator Install | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Flooring Install | 8 | 8 | 8 | 8 out of 10 | ||
Rough Carpentry | 8 | 8 | 8 | 8 out of 10 |
November 11, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of November, 11, 2024
Construction Activity | Mon 11 | Tue 12 | Wed 13 | Thu 14 | Fri 15 | Rating |
---|---|---|---|---|---|---|
Elevator Install | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Flooring Install | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Rough Carpentry | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
November 4, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of November, 4, 2024
Construction Activity | Mon 4 | Tue 5 | Wed 6 | Thu 7 | Fri 8 | Rating |
---|---|---|---|---|---|---|
Elevator Install | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Flooring Install | 8 | 8 | 8 | 8 out of 10 |
October 28, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of October, 28, 2024
Construction Activity | Mon 28 | Tue 29 | Wed 30 | Thu 31 | Fri 1 | Rating |
---|---|---|---|---|---|---|
Rough Plumbing | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Elevator Install | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Flooring Install | 8 | 8 | 8 | 8 out of 10 | ||
Rough Framing | 8 | 8 | 8 out of 10 |
October 21, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of October, 21, 2024
Construction Activity | Mon 21 | Tue 22 | Wed 23 | Thu 24 | Fri 25 | Rating |
---|---|---|---|---|---|---|
Rough Plumbing | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Elevator Install | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
October 14, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of October, 14, 2024
Construction Activity | Mon 14 | Tue 15 | Wed 16 | Thu 17 | Fri 18 | Rating |
---|---|---|---|---|---|---|
Elevator Electrical Prep | 4 | 4 | 4 out of 10 | |||
Rough MEP | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Elevator Install | 8 | 8 | 8 | 8 | 8 out of 10 |
October 7, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of October, 7, 2024
Construction Activity | Mon 7 | Tue 8 | Wed 9 | Thu 10 | Fri 11 | Rating |
---|---|---|---|---|---|---|
Roof Finish Work | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
North Entrance-Steel | 8 | 8 | 8 | 8 out of 10 | ||
Framing Upper Level | 8 | 8 | 8 | 8 out of 10 | ||
MEP in Framed Walls | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
September 30, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of September, 30, 2024
Construction Activity | Mon 30 | Tue 1 | Wed 2 | Thu 3 | Fri 4 | Rating |
---|---|---|---|---|---|---|
Elevator Safety Install/Electrical | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Roof Finish Work | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Steel Install | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Framing Upper Level | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
September 23, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of September, 23, 2024
Construction Activity | Mon 23 | Tue 24 | Wed 25 | Thu 26 | Fri 27 | Rating |
---|---|---|---|---|---|---|
Framing Main Level | 7 | 7 | 7 | 7 | 7 out of 10 | |
Framing Upper Level | 7 | 7 out of 10 | ||||
Pour Concrete Floor Upper Level | 8 | 8 out of 10 | ||||
Seismic Steel | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
September 16, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of September, 16, 2024
Construction Activity | Mon 16 | Tue 17 | Wed 18 | Thu 19 | Fri 20 | Rating |
---|---|---|---|---|---|---|
Framing Lower Level | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Form & Rebar Walls | 7 | 7 | 7 | 7 out of 10 | ||
Concrete Pour Main Level | 10 | 10 | 10 | 10 out of 10 |
September 9, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of September, 9, 2024
Construction Activity | Mon 9 | Tue 10 | Wed 11 | Thu 12 | Fri 13 | Rating |
---|---|---|---|---|---|---|
Roof | 4 | 4 | 4 | 4 | 4 | 4 out of 10 |
Form & Rebar Walls | 5 | 5 out of 10 | ||||
Concrete Pour Main Level | 5 | 5 out of 10 | ||||
Rough Mechanical & Plumbing | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Seismic Steel | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
September 2, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of September, 2, 2024
Construction Activity | Mon 2 | Tue 3 | Wed 4 | Thu 5 | Fri 6 | Rating |
---|---|---|---|---|---|---|
Pipe Insulation | 4 | 4 | 4 out of 10 | |||
Form & Rebar South Shear Wall Both Floors | 5 | 5 | 5 | 5 | 5 out of 10 | |
Roof Curb & Walls | 7 | 7 | 7 | 7 | 7 out of 10 | |
Seismic Steel | 8 | 8 | 8 | 8 | 8 out of 10 |
August 26, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of August, 26, 2024
Construction Activity | Mon 26 | Tue 27 | Wed 28 | Thu 29 | Fri 30 | Rating |
---|---|---|---|---|---|---|
Seismic Steel | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Form Walls Both Floors | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Pour Concrete | 10 | 10 | 10 | 10 | 10 out of 10 | |
Roof Install | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
August 19, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of August, 19, 2024
Construction Activity | Mon 19 | Tue 20 | Wed 21 | Thu 22 | Fri 23 | Rating |
---|---|---|---|---|---|---|
Mechanical Upper Level | 7 | 7 | 7 | 7 | 7 out of 10 | |
Form & Rebar Shear Wall Both Floors | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Seismic Steel | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
Roof Work | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
August 12, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of August, 12, 2024
Construction Activity | Mon 12 | Tue 13 | Wed 14 | Thu 15 | Fri 16 | Rating |
---|---|---|---|---|---|---|
Mechanical Upper Level | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Form & Rebar Install Shotcrete Upper Level | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Roof Steel | 10 | 10 out of 10 | ||||
Seismic Steel | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
Roof Work | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
August 5, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of August, 5, 2024
Construction Activity | Mon 5 | Tue 6 | Wed 7 | Thu 8 | Fri 9 | Rating |
---|---|---|---|---|---|---|
Abatement | 4 | 4 | 4 | 4 | 4 | 4 out of 10 |
Form & Rebar Install Shotcrete Upper Level | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Steel Install Across Hallways | 8 | 8 | 8 | 8 out of 10 | ||
Roof Install | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
July 29, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July, 29, 2024
Construction Activity | Mon 29 | Tue 30 | Wed 31 | Thu 1 | Fri 2 | Rating |
---|---|---|---|---|---|---|
Form & Rebar Shotcrete Upper Level | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Baseboard South Stair | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Mechanical Upper Level | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Roof Install | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
July 22, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July, 22, 2024
Construction Activity | Mon 22 | Tue 23 | Wed 24 | Thu 25 | Fri 26 | Rating |
---|---|---|---|---|---|---|
Abatement | 2 | 2 | 2 | 2 | 2 | 2 out of 10 |
Shotcrete Pour | 7 | 7 out of 10 | ||||
Roof Work | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
July 15, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July, 15, 2024
Construction Activity | Mon 15 | Tue 16 | Wed 17 | Thu 18 | Fri 19 | Rating |
---|---|---|---|---|---|---|
Gypsum Board | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Roof Phase 1 | 10 | 10 | 10 out of 10 | |||
Roof Phase 2 | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
Roof Phase 3 | 10 | 10 | 10 out of 10 |
July 8, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July, 8, 2024
Construction Activity | Mon 8 | Tue 9 | Wed 10 | Thu 11 | Fri 12 | Rating |
---|---|---|---|---|---|---|
Rough MEP South Stair | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Roof Phase 1 | 9 | 9 | 9 | 9 | 9 out of 10 | |
Roof Phase 2 | 9 | 9 | 9 | 9 out of 10 |
July 1, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of July, 1, 2024
Construction Activity | Mon 1 | Tue 2 | Wed 3 | Thu 4 | Fri 5 | Rating |
---|---|---|---|---|---|---|
Demo/Rough Electrical Rough HVAC | 5 | 5 | 5 | 5 | 5 out of 10 | |
Form & Rebar Install Shortcrete Main Level | 7 | 7 | 7 | 7 out of 10 | ||
Framing South Stair | 7 | 7 | 7 | 7 out of 10 |
June 24, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June, 24, 2024
Construction Activity | Mon 24 | Tue 25 | Wed 26 | Thu 27 | Fri 28 | Rating |
---|---|---|---|---|---|---|
Rebar for Shear Wall Main Level | 5 | 5 out of 10 | ||||
Steel Install South Stair | 7 | 7 | 7 out of 10 | |||
Framing South Stair | 7 | 7 | 7 | 7 out of 10 |
June 17, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June, 17, 2024
Construction Activity | Mon 17 | Tue 18 | Wed 19 | Thu 20 | Fri 21 | Rating |
---|---|---|---|---|---|---|
Demo & Rough Electrical | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Demo/Rough HVAC for Exhaust Fans | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
South Stair Rebar & Shotcrete | 8 | 8 | 8 out of 10 | |||
Install Steel Main Floor | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
June 10, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June, 10, 2024
Construction Activity | Mon 10 | Tue 11 | Wed 12 | Thu 13 | Fri 14 | Rating |
---|---|---|---|---|---|---|
Demo & Rough Electrical | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Demo/Rough HVAC for Exhaust Fans | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Form & Rebar for Shotcrete Lower Level | 5 | 5 | 5 out of 10 | |||
South Stair Rebar & Shotcrete | 6 | 6 | 6 | 6 out of 10 | ||
Install Steel Main Level | 8 | 8 | 8 | 8 out of 10 |
June 3, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of June, 3, 2024
Construction Activity | Mon 3 | Tue 4 | Wed 5 | Thu 6 | Fri 7 | Rating |
---|---|---|---|---|---|---|
Demo & Rough Electrical | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Demo/Rough HVAC for Exhaust Fans | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Form & Rebar for Shotcrete Lower Level | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
South Stair Rebar & Shotcrete | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
May 27, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of May, 27, 2024
Construction Activity | Mon 27 | Tue 28 | Wed 29 | Thu 30 | Fri 31 | Rating |
---|---|---|---|---|---|---|
Form & Rebar Work Shotcrete Walls Lower Level | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
South Wall Shotcrete/All Thread | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
May 13, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of May, 13, 2024
Construction Activity | Mon 13 | Tue 14 | Wed 15 | Thu 16 | Fri 17 | Rating |
---|---|---|---|---|---|---|
Relief Fans | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Roof Phase 1 | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Structural Steel | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Demo/Shoring South Stair | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
May 6, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of May, 6, 2024
Construction Activity | Mon 29 | Tue 30 | Wed 1 | Thu 2 | Fri 3 | Rating |
---|---|---|---|---|---|---|
Abatement | 2 | 2 | 2 | 2 | 2 | 2 out of 10 |
Underground Plumbing | 3 | 3 | 3 | 3 | 3 | 3 out of 10 |
Relief Fans | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Roof Phase 1 | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Structural Steel | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
April 29, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 29, 2024
Construction Activity | Mon 29 | Tue 30 | Wed 1 | Thu 2 | Fri 3 | Rating |
---|---|---|---|---|---|---|
Abatement | 2 | 2 | 2 | 2 | 2 | 2 out of 10 |
Waterproofing | 3 | 3 | 3 out of 10 | |||
Start up for Relief Fans | 3 | 3 | 3 | 3 | 3 | 3 out of 10 |
Form/Rebar for Mat Flooring | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Excavation | 7 | 7 out of 10 |
April 22, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 22, 2024
Construction Activity | Mon 22 | Tue 23 | Wed 24 | Thu 25 | Fri 26 | Rating |
---|---|---|---|---|---|---|
Waterproofing & Underground Plumbing | 3 | 3 | 3 | 3 | 3 | 3 out of 10 |
Abatement | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Demo/Rough HVAC for Exhaust Fans | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Excavation | 7 | 7 | 7 out of 10 |
April 15, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 15, 2024
Construction Activity | Mon 15 | Tue 16 | Wed 17 | Thu 18 | Fri 19 | Rating |
---|---|---|---|---|---|---|
Controls for Relief Fans | 3 | 3 | 3 | 3 | 3 out of 10 | |
Duct Work for Exhaust Fans | 6 | 6 | 6 out of 10 | |||
Demo/Rough HVAC for Exhaust Fans | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Excavation | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
April 8, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 8, 2024
Construction Activity | Mon 8 | Tue 9 | Wed 10 | Thu 11 | Fri 12 | Rating |
---|---|---|---|---|---|---|
Demo/Rough HVAC for Exhaust Fans | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Excavation | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
April 1, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of April, 1, 2024
Construction Activity | Mon 1 | Tue 2 | Wed 3 | Thu 4 | Fri 5 | Rating |
---|---|---|---|---|---|---|
Demo/Rough HVAC for Exhaust Fans | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Lower Level Closed | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Excavation | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
March 25, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 25, 2024
Construction Activity | Mon 25 | Tue 26 | Wed 27 | Thu 28 | Fri 29 | Rating |
---|---|---|---|---|---|---|
Move roof relief air fans | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Excavation | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Demo footings | 10 | 10 out of 10 |
March 18, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 18, 2024
Construction Activity | Mon 18 | Tue 19 | Wed 20 | Thu 21 | Fri 22 | Rating |
---|---|---|---|---|---|---|
Demo main floor steel | 6 | 6 | 6 | 6 out of 10 | ||
Demo concrete on lower level | 10 | 10 | 10 | 10 out of 10 |
March 11, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 11, 2024
Construction Activity | Mon 11 | Tue 12 | Wed 13 | Thu 14 | Fri 15 | Rating |
---|---|---|---|---|---|---|
Demo main floor steel | 6 | 6 | 6 | 6 out of 10 | ||
Steel for exhaust fans | 8 | 8 | 8 | 8 out of 10 | ||
Demo main floor concrete | 10 | 10 | 10 | 10 out of 10 |
March 4, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of March, 4, 2024
Construction Activity | Mon 4 | Tue 5 | Wed 6 | Thu 7 | Fri 8 | Rating |
---|---|---|---|---|---|---|
Fire Sprinklers | 5 | 5 out of 10 | ||||
Steel for exhaust fans | 6 | 6 | 6 out of 10 | |||
Demo Upper Floor Steel | 10 | 10 | 10 out of 10 | |||
Demo Main Floor Concrete | 10 | 10 | 10 | 10 | 10 out of 10 |
February 26, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of Feb, 26, 2024
Construction Activity | Mon 26 | Tue 27 | Wed 28 | Thu 29 | Fri 1 | Rating |
---|---|---|---|---|---|---|
Electrical Demo/Rough Electrical | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Demo/Rough HVAC for exhaust fans | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Rough Plumbing | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Demo Upper Floor | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
February 19, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of Feb, 19, 2024
Construction Activity | Mon 19 | Tue 20 | Wed 21 | Thu 22 | Fri 23 | Rating |
---|---|---|---|---|---|---|
Electrical Demo/Rough Electrical | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Demo/Rough HVAC for exhaust fans | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Rough Plumbing | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Steel for exhaust fans | 10 | 10 | 10 | 10 | 10 out of 10 |

Eccles Health Sciences Library will be having a wifi outage on Monday February 19, 2024 from 6AM to about 8:30AM.
February 12, 2024 | EHSL Construction update

Eccles Health Library construction disturbance level for the week of Feb, 12, 2024
Construction Activity | Mon 12 | Tue 13 | Wed 14 | Thu 15 | Fri 16 | Rating |
---|---|---|---|---|---|---|
Rough Plumbing | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Electrical Demo/Rough Electrical | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Demo/Rough HVAC for exhaust fans | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Steel Install upper core/main floor Steel for exhaust fans | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
February 5, 2024 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Feb, 5, 2024
Construction Activity | Mon 5 | Tue 6 | Wed 7 | Thu 8 | Fri 9 | Rating |
---|---|---|---|---|---|---|
Steel Abatement | 2 | 2 | 2 | 2 | 2 out of 10 | |
Rough Plumbing | 5 | 5 | 5 | 5 | 5 out of 10 | |
Electrical Demo/Rough Electrical | 6 | 6 | 6 | 6 | 6 out of 10 | |
Steel Install around core | 10 | 10 | 10 | 10 | 10 out of 10 |
January 29, 2024 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Jan, 29, 2024
Construction Activity | Mon 29 | Tue 30 | Wed 31 | Thu 1 | Fri 2 | Rating |
---|---|---|---|---|---|---|
Steel Abatement | 2 | 2 | 2 | 2 | 2 | 2 out of 10 |
UIT Relocation | 3 | 3 | 3 | 3 | 3 | 3 out of 10 |
Rough Plumbing | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Steel Install around core Electrical Demo/Rough Electrical | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
January 22, 2024 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Jan, 22, 2024
Construction Activity | Mon 22 | Tue 23 | Wed 24 | Thu 25 | Fri 26 | Rating |
---|---|---|---|---|---|---|
Steel Abatement | 2 | 2 | 2 | 2 | 2 | 2 out of 10 |
UIT Relocation | 3 | 3 | 3 | 3 | 3 | 3 out of 10 |
Mechanical Demo/Rerouting Rough Plumbing | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
January 15, 2024 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Jan, 15, 2024
Construction Activity | Mon 15 | Tue 16 | Wed 17 | Thu 18 | Fri 19 | Rating |
---|---|---|---|---|---|---|
Steel Abatement around core Electrical Demo/Rough Electrical | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Mechanical Demo/Rerouting Rough Plumbing | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Demo concrete columns/walls Core Drilling for UIT | 10 | 10 | 10 | 10 out of 10 | ||
Micropiles in basement | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
January 8, 2024 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Jan, 8, 2024
Construction Activity | Mon 8 | Tue 9 | Wed 10 | Thu 11 | Fri 12 | Rating |
---|---|---|---|---|---|---|
UIT Relocation | 3 | 3 | 3 | 3 | 3 | 3 out of 10 |
Rough Plumbing/Electrical Demo | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Drywall & Steel Abatement | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Demo South Stair | 10 | 10 | 10 | 10 | 10 | 10 out of 10 |
January 1, 2024 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Jan, 1, 2024
Construction Activity | Mon 1 | Tue 2 | Wed 3 | Thu 4 | Fri 5 | Rating |
---|---|---|---|---|---|---|
UIT Relocation | 3 | 3 | 3 | 3 | 3 out of 10 | |
Rough Plumbing/Electrical Demo | 4 | 4 | 4 | 4 | 4 out of 10 | |
Drywall Abatement & Mechanical Demo/Rerouting | 5 | 5 | 5 | 5 | 5 out of 10 | |
Demolition of Concrete & Walls | 10 | 10 | 10 | 10 | 10 out of 10 |
December 25, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Dec, 25, 2023
Construction Activity | Mon 25 | Tue 26 | Wed 27 | Thu 28 | Fri 29 | Rating |
---|---|---|---|---|---|---|
UIT Relocation | 3 | 3 | 3 | 3 | 3 out of 10 | |
Rough Plumbing/Electrical Demo | 4 | 4 | 4 | 4 | 4 out of 10 | |
Drywall Abatement & Mechanical Demo/Rerouting | 5 | 5 | 5 | 5 | 5 out of 10 | |
Demolition of Concrete & Walls | 10 | 10 | 10 | 10 | 10 out of 10 |
December 18, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Dec, 18, 2023
Construction Activity | Mon 11 | Tue 12 | Wed 13 | Thu 14 | Fri 15 | Rating |
---|---|---|---|---|---|---|
Drywall Abatement | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Mechanical Demo/Rerouting | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Rough Plumbing | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Electrical Demo | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
December 13, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Dec, 13, 2023
Construction Activity | Mon 11 | Tue 12 | Wed 13 | Thu 14 | Fri 15 | Rating |
---|---|---|---|---|---|---|
Drywall Abatement | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Demo Salvaged Store Front | 5 | 5 | 5 | 5 out of 10 | ||
Mechanical Demo | 5 | 5 | 5 | 5 | 5 out of 10 | |
Rough Plumbing & Electrical Demo | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
December 4, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Dec, 4, 2023
Construction Activity | Mon 4 | Tue 5 | Wed 6 | Thu 7 | Fri 8 | Rating |
---|---|---|---|---|---|---|
Set up temp walls/demo salvaged items | 3 | 3 | 3 | 3 | 3 | 3 out of 10 |
UIT Relocation | 3 | 3 | 3 | 3 | 3 | 3 out of 10 |
MEP Demo/Evaluation & Fire Sprinkler relocation | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Drywall Abatement | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
November 27, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Nov, 27, 2023
Construction Activity | Mon 27 | Tue 28 | Wed 29 | Thu 30 | Fri 1 | Rating |
---|---|---|---|---|---|---|
Phase 2 Mob | 1 | 1 out of 10 | ||||
Phase 2 Temp Walls | 1 | 1 | 1 | 1 | 1 out of 10 | |
Phase 2 Selective Demo/Salvaged Items | 2 | 2 out of 10 |
November 20, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Nov, 20, 2023
Construction Activity | Mon 20 | Tue 21 | Wed 22 | Thu 23 | Fri 24 | Rating |
---|---|---|---|---|---|---|
Taking Down Phase 1 Panels | 1 | 1 out of 10 | ||||
Punch List/Cleaning | 1 | 1 | 1 | 1 out of 10 |
November 13, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Nov, 13, 2023
Construction Activity | Mon 13 | Tue 14 | Wed 15 | Thu 16 | Fri 17 | Rating |
---|---|---|---|---|---|---|
Finish Electrical | 1 | 1 | 1 | 1 | 1 | 1 out of 10 |
Acoustical Ceiling Grid/Tiles | 3 | 3 | 3 out of 10 |
November 6, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Nov, 6, 2023
Construction Activity | Mon 6 | Tue 7 | Wed 8 | Thu 9 | Fri 10 | Rating |
---|---|---|---|---|---|---|
Reinstall wood panels | 4 | 4 | 4 | 4 | 4 | 4 out of 10 |
October 30, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Oct, 30, 2023
Construction Activity | Mon 30 | Tue 31 | Wed 1 | Thu 2 | Fri 3 | Rating |
---|---|---|---|---|---|---|
Reinstall wood panels | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
October 23, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Oct, 23, 2023
Construction Activity | Mon 23 | Tue 24 | Wed 25 | Thu 26 | Fri 27 | Rating |
---|---|---|---|---|---|---|
Reinstall wood panels | 4 | 4 | 4 | 4 | 4 | 4 out of 10 |
October 16, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Oct, 16, 2023
Construction Activity | Mon 16 | Tue 17 | Wed 18 | Thu 19 | Fri 20 | Rating |
---|---|---|---|---|---|---|
Framing | 6 | 6 | 6 out of 10 | |||
Reroof | 4 | 4 | 4 out of 10 | |||
Installing gyp board (constant drilling) | 4 | 4 | 4 | 4 | 4 | 4 out of 10 |
October 9, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Oct, 9, 2023
Construction Activity | Mon 9 | Tue 10 | Wed 11 | Thu 12 | Fri 13 | Rating |
---|---|---|---|---|---|---|
Insulation | 3 | 3 | 3 | 3 | 3 out of 10 | |
Rough Electrical | 3 | 3 | 3 | 3 | 3 | 3 out of 10 |
Reroof | 4 | 4 | 4 | 4 | 4 out of 10 |
September 25, 2023 | EHSL Construction update

Construction Activity | Mon 18 | Tue 19 | Wed 20 | Thu 21 | Fri 22 | Rating |
---|---|---|---|---|---|---|
Structural Steel at Roof *Use of “puncture gun” sound can resemble gunshots | 8 | 8 | 8 out of 10 | |||
Shotcrete Rebar Drilling | 8 | 8 | 8 | 8 | 8 out of 10 | |
Sewer | TBD | TBD | TBD | TBD |
September 18, 2023 | EHSL Construction update
Eccles Sciences Health Library construction disturbance level for the week of Sept, 18, 2023

Construction Activity | Mon 18 | Tue 19 | Wed 20 | Thu 21 | Fri 22 | Rating |
---|---|---|---|---|---|---|
Structural Steel Welding *Potential fumes | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
Structural Steel Roof *Use of “puncture gun”, sound can resemble gunshots | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Structural Steel Bent Plate (Drilling) | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |
Shotcrete Rebar Drilling | 8 | 8 | 8 | 8 | 8 | 8 out of 10 |

The next phase of the seismic retrofit will be attaching the steel plates to the roof. This involves the use of a ‘puncture gun’ which can sometimes resemble the sound of gunshots. This will take place in EHSL from Friday September 15 through the 22.

Structural steel welding could cause possible fumes inside EHSL from September 11 – 15, 2023
September 11, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Sept, 11, 2023
Construction Activity | Mon 11 | Tue 12 | Wed 13 | Thu 14 | Fri 15 | Rating |
---|---|---|---|---|---|---|
Steel Plates | 4 | 4 | 4 | 4 | 4 | 4 out of 10 |
Structural Steel Roof *Use of “puncture gun”, sound can resemble gunshots | 7 | 7 | 7 | 7 | 7 out of 10 | |
Structural Steel Welding *Potential fumes | 6 | 6 | 6 | 6 | 6 | 6 out of 10 |
September 4, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Sept, 4, 2023
Construction Activity | Mon 4 | Tue 5 | Wed 6 | Thu 7 | Fri 8 | Rating |
---|---|---|---|---|---|---|
Steel Install | 7 | 7 | 7 | 7 | 7 | 7 out of 10 |
Drilling for rebar | 8 | 8 | 8 | 8 out of 10 | ||
Structural Steel Welding *Potential fumes | 6 | 6 out of 10 |
August 28, 2023 | EHSL Construction update

Eccles Sciences Health Library construction disturbance level for the week of Aug, 28, 2023
Construction Activity | Mon 28 | Tue 29 | Wed 30 | Thu 31 | Fri 1 | Rating |
---|---|---|---|---|---|---|
Steel Layout/drilling | 6 | 6 | 6 | 6 out of 10 | ||
Steel Install | 7 | 7 | 7 out of 10 | |||
Sewer Install | 8 | 6 | 6 | 6 | 6 | 6 out of 10 |
August 21, 2023 | EHSL Construction update

August 21, 2023 | Eccles School of Medicine construction disturbance level for the week.

Construction Activity | Mon 21 | Tue 22 | Wed 23 | Thu 24 | Fri 25 | Rating |
---|---|---|---|---|---|---|
HP Pile Shoring & Shotcrete Work | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Concrete Footings & Foundations | 3 | 3 | 3 | 3 | 3 | 3 out of 10 |
Demolish College of Nursing Parking Garage | 8 | 8 out of 10 |
August 14, 2023 | Eccles School of Medicine construction disturbance level for the week.

Construction Activity | Mon 14 | Tue 15 | Wed 16 | Thu 17 | Fri 18 | Rating |
---|---|---|---|---|---|---|
HP Pile Shoring & Shotcrete Work | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
Concrete Footings & Foundations | 3 | 3 | 3 | 3 | 3 | 3 out of 10 |
August 7, 2023 | Eccles School of Medicine construction disturbance level for the week.

Construction Activity | Mon 7 | Tue 8 | Wed 9 | Thu 10 | Fri 11 | Rating |
---|---|---|---|---|---|---|
Shotcrete and Soil Noils of EHSL Mechanical Room | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
HP Pile Shoring Work | 5 | 5 | 5 | 5 | 5 | 5 out of 10 |
July 29, 2023 | EHSL closed during planned power outage Saturday, July 29 from 6 AM to 10 AM.
IMPACTS:
- No after-hours badge access in EHSL
- Study rooms available at EHSEB during this time period
- Turn off any connected devices requiring power
- Off-campus website access normal operations

June 9-12, 2023 | EHSL closed during planned power outage from Friday, 3 PM, June 9, until Monday, 7 AM, June 12.
IMPACTS:
- No after-hours badge access in EHSL. Please use EHSEB during this time period
- Turn off any connected devices requiring power
- Off-campus website access normal operations

June 5, 2023 | Retrofit construction begins, south east corner, main and upper level.
IMPACTS:
- Construction noise
- North, South and EHSEB bridge entries all accessible

May 24, 2023 | Level A access to School of Medicine (SOM) closes. Concrete removal scheduled to start.
IMPACTS:
- Level 1 south east door opens with badge access
- Potential concrete removal begins anticipate high-level noise, ground vibrations and disruptive working environments
- North, South and EHSEB bridge entries all accessible

May 23, 2023 | North and South doors of EHSL replaced, main entrance closes
IMPACTS:
- North and South doors inaccessible
- Main entrance closes for duration of SOM construction
- EHSEB bridge entry remains open

May 23, 2023 | EHSL main and north entrance closed no card entrance. Access through the EHSEB bridge. Reopening TBA.
Due to a new doors and card reader installation at the new south entrance location.
May 22, 2023 | School of Medicine (SOM): West sidewalk closes
IMPACTS:
- Access to Main level entrance closed for duration of SOM construction
- EHSL access restricted to EHSEB bridge and North doors


May 11, 2023 | Phase 1: South bike racks removal
May 8, 2023 | Phase 1: Furniture removal from the southeast corner on the main level.
April 17, 2023 | Spencer Fox Eccles School of Medicine construction perimeter fence installation.
View the construction map for impacted areas.

Traffic Impacts

To see the most current information https://map.utah.edu/
March 16, 2023 | We have exciting news for 2023: EHSL is preparing for an earthquake retrofit! We anticipate construction changes and updates over the next three years. Stay up to date on all the details at the construction website.
View Seismic Construction Timeline