EHSL Seismic Retrofit, Phase 1

2023/Start

APR

2023/End

OCT

EHSL logo, red

FOR URGENT BUILDING REQUESTS CONTACT 801-581-7221 (24hr)

Updates

UPCOMING:

June 5, 2023 | Retrofit construction begins, south east corner, main and upper level.

IMPACTS:

  • Construction noise
  • North, South and EHSEB bridge entries all accessible

May 24, 2023 | Level A access to School of Medicine (SOM) closes. Concrete removal scheduled to start.

IMPACTS:

  • Level 1 south east door opens with badge access
  • Potential concrete removal begins anticipate high-level noise, ground vibrations and disruptive working environments
  • North, South and EHSEB bridge entries all accessible
Level A access to School of Medicine (SOM) closes. Concrete removal scheduled to start.

May 23, 2023 | North and South doors of EHSL replaced, main entrance closes

IMPACTS:

  • North and South doors inaccessible
  • Main entrance closes for duration of SOM construction
  • EHSEB bridge entry remains open
EHSL North and South doors replaced. Access by EHSEB bridge upper level.

May 23, 2023 | EHSL main and north entrance closed no card entrance. Access through the EHSEB bridge. Reopening TBA.

Due to a new doors and card reader installation at the new south entrance location.


May 22, 2023 | School of Medicine (SOM): West sidewalk closes

IMPACTS:

  • Access to Main level entrance closed for duration of SOM construction
  • EHSL access restricted to EHSEB bridge and North doors
Spencer Fox Eccles School of Medicine west side walk closes, May 22, 2023

Past Updates

May 11, 2023 | Phase 1: South bike racks removal

May 8, 2023 | Phase 1: Furniture removal from the southeast corner on the main level.


April 17, 2023 | Spencer Fox Eccles School of Medicine construction perimeter fence installation.

View the construction map for impacted areas.

Spencer Fox Eccles School of Medicine construction perimeter fence installation.
Click to view the full-size image of the impacted areas.

Traffic Impacts

Spencer Fox Eccles School of Medicine construction perimeter fence traffic impact
Click to view the full-size image of the traffic impact.

To see the most current information https://map.utah.edu/


March 16, 2023 | We have exciting news for 2023: EHSL is preparing for an earthquake retrofit! We anticipate construction changes and updates over the next three years. Stay up to date on all the details at the construction website.

View Seismic Construction Timeline

EHSL Construction Timeline
Click to view the full-size image of the project timeline

You will love the changes. Safer, Quieter, More Comfortable

What to Expect:

2023APRPHASE 1
Earthquake retrofitting, southeast corner of building.
2023OCTPHASE 2
Construction of the core, central elevator shaft.